Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Exterior
Alloy Wheels
Convenience
USB Port
Safety
Automatic Emergency Braking
Backup Camera
Brake Assist
Stability Control
Features
- 12V power outlets 2 12V power outlets
- 17in Alloy Wheels
- 3-point seatbelt Rear seat center 3-point seatbelt
- 4 Speakers
- 4-Wheel Disc Brakes
- 5.05 Axle Ratio
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- ABS brakes
- AM/FM radio
- Accessory power Retained accessory power
- Air Conditioning
- Air conditioning Yes
- All-in-one key All-in-one remote fob and ignition key
- Alloy wheels
- Alternator Type Alternator
- Antenna Integrated roof audio antenna
- Armrests front center Sliding front seat center armrest
- Armrests rear Rear seat center armrest
- Audio theft deterrent Audio system theft deterrent
- Auto door locks Auto-locking doors
- Auto headlights Auto off headlight control
- Automatic Emergency Braking
- Automatic brake hold
- Automatic temperature control
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery charge warning
- Battery type Lead acid battery
- Beverage holders Front beverage holders
- Beverage holders rear Rear beverage holders
- Body panels Fully galvanized steel body panels with side impact beams
- Bodyside cladding Black bodyside cladding
- Brake Assist
- Brake assist
- Brake assist system
- Brake type 4-wheel disc brakes
- Bumper insert Metal-look front bumper insert
- Bumper rub strip front Black front bumper rub strip
- Bumper rub strip rear Metal-look rear bumper rub strip
- Bumpers front Body-colored front bumper
- Bumpers rear Black rear bumper
- Bumpers: body-color
- Cabin air filter
- Capless fuel filler
- Cargo floor type Carpet cargo area floor
- Cargo light Cargo area light
- Cargo tie downs Cargo area tie downs
- Child door locks Manual rear child safety door locks
- Climate control Automatic climate control
- Clock Digital clock
- Cloth Seat Trim
- Compass
- Console insert material Metal-look console insert
- Conversation mirror
- Convex spotter Driver convex spotter mirror
- Corrosion perforation warranty 60 month/unlimited
- Cruise control Cruise control with steering wheel mounted controls
- Cylinder head material Aluminum cylinder head
- Day/Night rearview mirror
- Delay off headlights Delay-off headlights
- Delay-off headlights
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Black door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Black door mirrors
- Door mirror type Standard style side mirrors
- Door mirrors Power door mirrors
- Door panel insert Metal-look door panel insert
- Door trim insert Cloth door trim insert
- Drive type Front-wheel drive
- Driver door bin
- Driver foot rest
- Driver information center
- Driver seat direction Driver seat with 6-way directional controls
- Driver vanity mirror
- Drivetrain selectable Eco Assist driver selectable drivetrain mode
- Dual front impact airbags
- Dual front side impact airbags
- Eco Feedback Eco Assist ECO feedback display gauge
- Electronic Stability Control
- Electronic parking brake
- Electronic stability control Electronic stability control system
- Emissions LEV3-ULEV70 emissions
- Emissions tiers Tier 3 Bin 70 emissions
- Engine 2.4L I-4 gasoline direct injection
- DOHC
- i-VTEC variable valve control
- regular unleaded
- engine with 184HP
- Engine Configuration I4
- Engine Location Front mounted engine
- Engine Mounting direction Transverse mounted engine
- Engine Short 2.4L I-4 DOHC
- Engine block material Aluminum engine block
- Engine temperature warning
- Engine/electric motor temperature gauge
- Exterior Parking Camera Rear
- External memory External memory control
- First-row windows Power first-row windows
- Floor console Full floor console
- Floor console storage Covered floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Carpet front and rear floor mats
- Folding door mirrors Manual folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Four wheel independent suspension
- Front Bucket Seats
- Front Center Armrest
- Front anti-roll Front anti-roll bar
- Front anti-roll bar
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front reading lights
- Front seat upholstery Cloth front seat upholstery
- Front seatback upholstery Cloth front seatback upholstery
- Front side impact airbag driver SmartVent seat mounted side impact driver airbag
- Front side impact airbag passenger SmartVent seat mounted side impact front passenger airbag
- Fuel Type Regular unleaded
- Fuel door Manual fuel door release
- Gearshifter material Urethane gear shifter material
- Glove box Locking glove box
- Grille style Chrome grille
- Handsfree Bluetooth HandsFreeLink handsfree wireless device connectivity
- Headlight type Projector beam headlights
- Headlights Halogen headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated wiper area Heated rear wiper park
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill start assist
- Ignition Spark ignition system
- Ignition type Mechanical
- Illuminated entry
- Illuminated ignition switch
- Immobilizer
- Instrumentation display Digital/analog instrumentation display
- Interior accents Metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet radio capability Pandora compatibility internet radio capability
- Key in vehicle warning
- Keyfob keyless entry
- Keyless Entry
- LED brake lights
- Lock-up transmission
- Low level warnings Low level warning for fuel and brake fluid
- Low tire pressure warning
- Manual driver seat controls Driver seat manual reclining
- fore/aft control and height adjustable control
- Manual passenger seat controls Passenger seat manual reclining and fore/aft control
- Multi-level cargo floor
- Multiple headlights Multiple enclosed headlights
- Noise cancellation Active noise cancellation
- Number of airbags 6 airbags
- Number of beverage holders 8 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Occupancy sensor Airbag occupancy sensor
- Occupant sensing airbag
- Oil pressure warning
- One-touch down window Driver one-touch down window
- One-touch up window Driver one-touch up window
- Outside temperature display
- Overdrive transmission
- Overhead airbag
- Overhead airbags Curtain first and second-row overhead airbags
- Overhead console
- Overhead console Mini overhead console
- Overhead console storage
- Paint Pearlcoat paint
- Panel insert Piano black and metal-look instrument panel insert
- Panic alarm
- Passenger door bin
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 4-way directional controls
- Passenger vanity mirror
- Power door mirrors
- Power steering
- Power windows
- Powertrain type ICE
- Powertrain warranty 60 month/60
- 000 miles
- Primary display size 5 inch primary display
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM
- Radio data system
- Radio: AM/FM Audio System w/4 Speakers
- Rear Spoiler
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear anti-roll bar
- Rear camera Rear mounted camera
- Rear cargo door Liftgate rear cargo door
- Rear console climate control ducts
- Rear head restraint control 3 rear seat head restraints
- Rear head restraint control Manual rear seat head restraint control
- Rear head restraints Height adjustable rear seat head restraints
- Rear seat center armrest
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold forward rear seatback
- Rear seat upholstery Cloth rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats Split-bench rear seat
- Rear seats fixed or removable Fixed rear seats
- Rear under seat ducts Rear under seat climate control ducts
- Rear window defroster
- Rear window wiper
- Rear windshield Fixed rear windshield
- Rear windshield wipers
- Reclining rear seats Manual reclining rear seats
- Remote keyless entry
- Remote panic alarm
- Roadside warranty 36 month/36
- 000 miles
- Running lights LED daytime running lights
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 5
- Second-row windows Power second-row windows
- Seek scan
- Selectable mode transmission
- Service interval warning Service interval indicator
- Shock absorbers Gas-pressurized shock absorbers
- Shutters Active grille shutters
- Spare tire Compact spare tire with steel wheel
- Spare tire location Spare tire mounted under the cargo floor
- Speakers Standard grade speakers
- Speakers number 4 speakers
- Special paint Monotone paint
- Speed control
- Speed sensitive steering Speed sensitive power steering
- Speed sensitive volume
- Speed-sensing steering
- Split folding rear seat
- Split front seats Bucket front seats
- Spoiler
- Spoiler Rear lip spoiler
- Springs front Front coil springs
- Springs rear Rear coil springs
- Stability Control
- Steering Electric power-assist steering system
- Steering mounted audio control Steering wheel mounted audio controls
- Steering type Rack-pinion steering
- Steering wheel material Urethane steering wheel
- Steering wheel mounted audio controls
- Steering wheel telescopic Manual telescopic steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Suspension Standard ride suspension
- Suspension ride type front Independent front suspension
- Suspension ride type rear Independent rear suspension
- Suspension type front Strut front suspension
- Suspension type rear Multi-link rear suspension
- Tachometer
- Tailgate control Tailgate/power door lock
- Tailpipe Stainless steel single exhaust
- Telescoping steering wheel
- Temperature display Exterior temperature display
- Third-row windows Fixed third-row windows
- Tilt steering wheel
- Tinted windows Light tinted windows
- Tires P235/65HR17 AS BSW front and rear tires
- Traction Control
- Traction control
- Traction control All-speed ABS and driveline traction control
- Transmission CVT
- Transmission Type Automatic
- Transmission electronic control
- Transmission fluid temperature warning Transmission fluid temp warning
- Trip computer
- Trip odometer
- Trunk lid trim Plastic trunk lid trim
- USB Port
- USB ports 1 USB port
- Valet key
- Variable panel light Variable instrument panel light
- Ventilated brakes Front ventilated disc brakes
- Visor driver expandable coverage Driver visor with expandable coverage
- Visor driver mirror Driver visor mirror
- Visor passenger expandable coverage Passenger visor with expandable coverage
- Visor passenger mirror Passenger visor mirror
- Wheel well trim Black wheel well trim
- Wheels 17 x 6.5-inch front and rear silver aluminum wheels
- Window Trim Chrome side window trim
- Windshield trim Black windshield trim
- Wipers Fixed interval front windshield wipers
- Wireless streaming Bluetooth wireless audio streaming
Seller's Comments
Welcome to Sunny and Beautiful CarLink Fort Myers! At CarLink, we offer ONE PRICE-OUR BEST PRICE, along with some of the lowest financing rates available! We also offer special financing for bad credit and no or new credit. We have one of the best selections around, with over 125 pre-owned vehicles in stock! Our Online Sales Event prices are valid from now until Saturday at 5:00PM close of business. For more pictures, videos, and information about this vehicle, please visit us 24/7 at CarLink.com. All deals are subject to a $1,299 documentation fee, applicable state sales tax, $899 electronic filing fee, title and registration fees. If you have any questions, feel free to call 239-392-1400 or visit our showroom at 3322 Fowler Street, Fort Myers, FL 33901. CR-V LX, 4D Sport Utility, 2.4L I4 DOHC 16V i-VTEC, CVT, FWD, Red, Gray w/Cloth Seat Trim. Odometer is 32497 miles below market average! Recent Arrival! 26/32 City/Highway MPG Clean CARFAX.2017 Honda CR-V LX
View MoreLooking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

