Powered by Cars.com

2020 Ram ProMaster City

$9,900used

Contact Dealership

Basics

Condition

used

Interior Color

black

Exterior Color

bright white clear coat

Drivetrain

Front-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

Tigershark MultiAir 2.4L I-4 DOHC, variable valve control, regul

VIN

ZFBHRFAB9L6PZ3751

Stock Number

L6PZ3751STK

Mileage

136,522

Features

Convenience

USB Port

Safety

Automatic Emergency Braking

Backup Camera

Brake Assist

Stability Control

View Full List of Features

Seller's Comments

DIRECT AUTO SALES (DLR) has the following DEPENDABLE, CARGO MINI-VAN for sale - a 2020 Ram ProMaster City Tradesman (renowned for its excellent performance, comfortable ride, and everyday practicality).

Tigershark MultiAir 2 2.4L I4 178hp 174ft. lbs. engine
MILEAGE ----- 136,522 miles
9-Speed Shiftable Automatic transmission
Front Wheel Drive
PRICE ----- $9,990
(+ Minnesota taxes and fees)

TITLE ----- New owner will receive a Rebuilt title

CONDITION AND NOTES:

* Runs and drives excellent; everything works as it should
* Clean Bright White Clear Coat (White) exterior in great condition
* Clean Black (Black) interior
* Damage history: Rebuilt title vehicle - professionally repaired, contact for details
* Incredible value priced significantly below retail at only $6,990

DIRECT AUTO SALES (DLR) - call or text: 612-431-4600 about the vehicle.
WE TAKE TRADES. FINANCING AVAILABLE.
OUR ADDRESS: 23220 Hwy 55, Loretto, MN 55357

FEATURES AND AMENITIES:

* Touchscreen display with smartphone integration
* Bluetooth connectivity for hands-free calling and music
* Multi-zone climate control
* Rearview backup camera
* Power windows, mirrors, and locks

PERFORMANCE AND PRACTICALITY:

* Fuel-efficient engine offering excellent MPG
* Smooth-shifting transmission
* Comfortable seating with plenty of cabin and cargo space
* Perfect daily commuter or work vehicle

SAFETY:

* Advanced multi-stage airbag system
* Anti-lock Braking System (ABS)
* Electronic Stability Control (ESC) and Traction Control
* Tire Pressure Monitoring System (TPMS)

Tag words: 2020 Ram ProMaster City Tradesman Transit Connect NV200 Metris Cargo Van Mini-Van FWD Front Wheel Drive reliable MN Twin Cities Loretto Used Rebuilt Title

Contact Direct Auto Sales

Call (952) 200-6092

Direct Auto Sales
0 |
2 Lifetime Reviews

18076 Territorial Rd

Maple Grove, Minnesota 55369

(952) 200-6092

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.