Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Entertainment
Premium Sound System
Exterior
Alloy Wheels
Sunroof/Moonroof
LED Headlights
Tow Hitch
Seating
Cooled Seats
Memory Seat
Heated Seats
Leather Seats
Safety
Automatic Emergency Braking
Backup Camera
Blind Spot Monitor
Brake Assist
Stability Control
Lane Departure Warning
Convenience
Adaptive Cruise Control
Keyless Start
Heated Steering Wheel
Navigation System
Remote Start
Tow Hooks
USB Port
Features
- 12V power outlets 2 12V power outlets
- 3-point seatbelt Rear seat center 3-point seatbelt
- 3.92 Rear Axle Ratio
- 33 Gallon Fuel Tank
- 4 Way Front Headrests
- 4WD
- 4WD type Part and full-time 4WD
- 5.7L V8 HEMI MDS VVT ETorque Engine
- 50 State Emissions
- 7
- 100 lbs GVWR
- 8-Speed Automatic Transmission
- ABS (4-Wheel)
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- AM/FM/HD Radio
- Accessory power Retained accessory power
- Adaptive Cruise Control
- Adaptive cruise control Adaptive cruise control with stop and go
- Adaptive headlights Adaptive Front-lighting System directionally adaptive headlights
- Adjustable pedals Power adjustable pedals
- Advanced Safety Pkg.
- Air Conditioning
- Air Suspension
- Air conditioning Yes
- Alarm System
- All-in-one key All-in-one remote fob and ignition key
- Aluminum/Alloy Wheels
- Ambient lighting
- Amplifier 900W amplifier
- Android Auto
- Antenna Fixed audio antenna
- Anti-Spin Differential Rear Axle
- Apple CarPlay
- Armrests front center Front seat center armrest
- Armrests front storage Front seat armrest storage
- Armrests rear Rear seat center armrest
- Auto door locks Auto-locking doors
- Auto headlights Auto on/off headlight control
- Auto high-beam headlights
- Auto-dimming door mirror driver Auto-dimming driver side mirror
- Auto-dimming door mirror passenger Auto-dimming passenger side mirror
- Automatic Emergency Braking
- Automatic vehicle parking
- Automatic; 8-Spd
- Aux input jack Auxiliary input jack
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery type Lead acid battery
- Bed Liner
- Bed Utility Group
- Bed liner MOPAR spray-in pickup bed liner
- Bed-rail protectors Pickup bed-rail protectors
- Beverage holders Illuminated front beverage holders
- Beverage holders rear Rear beverage holders
- Black
- Blind Spot Monitor
- Blind spot Blind Spot Detection
- Blind-Spot Alert
- Blue
- Bluetooth Wireless
- Body panels Galvanized steel/aluminum body panels with side impact beams
- Bodyside moldings Chrome bodyside moldings
- Box style Standard style pickup box
- Brake Assist
- Brake assist system Predictive brake assist system
- Brake type 4-wheel disc brakes
- Bucket Seats
- Bulb warning Bulb failure warning
- Bumper rub strip front Body-colored front bumper rub strip
- Bumpers front Body-colored front bumper
- Bumpers rear Body-colored rear bumper
- Cab mounted cargo light
- Cabin air filter N95+Bio cabin air filter
- Camera Surround View Camera System aerial view camera
- Capless fuel filler
- Cargo access Power cargo area access release
- Cell traction battery 12
- Child door locks Manual rear child safety door locks
- Climate control Automatic climate control
- Clock Digital clock
- Compass
- Configurable instrumentation gauges
- Console insert material Leather and genuine wood console insert
- Convex spotter Driver and passenger convex spotter mirrors
- Cooled Driver Seat
- Cooled Front Seats
- Cooled Passenger Seat
- Cooled front seats Ventilated driver and front passenger seats
- Cooled rear seats Ventilated rear seats
- Corrosion perforation warranty 60 month/unlimited
- Cruise Control
- Cruise control Cruise control with steering wheel mounted controls
- Cylinder head material Aluminum cylinder head
- DRL preference setting
- Dashboard material Leather upholstered dashboard
- Day/Night rearview mirror
- Daytime Running Lights
- Delay off headlights Delay-off headlights
- Deluxe sound insulation
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Colored door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Black door mirrors
- Door mirror type Standard style side mirrors
- Door mirror with tilt-down in reverse Power driver and passenger door mirrors with tilt down in reverse
- Door panel insert Genuine wood and metal-look door panel insert
- Door trim insert Leather door trim insert
- Drive type Four-wheel drive
- Driver Seat Memory
- Driver information center
- Driver lumbar Driver seat with 4-way power lumbar
- Driver seat direction Driver seat with 8-way directional controls
- Driver's Seat Memory
- Dual Air Bags
- Dual Climate Control
- Dual Moon Roofs
- Dual Power Seats
- Dual-Pane Panoramic Sunroof
- Dual-zone front climate control
- Easy lower tailgate
- Electric powertrain ETorque MHEV (mild hybrid electric vehicle)
- Electronic Stability Control
- Electronic parking brake
- Electronic stability control Electronic stability control system with anti-roll
- Emissions LEV3-ULEV70 emissions
- Emissions tiers Tier 3 Bin 70 emissions
- Engine Cylinders HEMI V8
- Engine HEMI 5.7L V-8 variable valve control
- regular unleaded
- engine with cylinder deactivation and 395HP
- Engine Location Front mounted engine
- Engine Mounting direction Longitudinal mounted engine
- Engine block material Iron engine block
- Engine hour meter
- Engine temperature warning
- Engine/electric motor temperature gauge
- External memory External memory control
- F&R Head Curtain Air Bags
- F&R Park Assist
- Fenders Body-colored fender flares
- First-row sunroof First and second-row sliding and tilting glass sunroof with express open/close activation sunshade
- First-row windows Power first-row windows
- Floor console Full floor console
- Floor console storage Covered floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Rubber front and rear floor mats with carpet inserts
- Fob engine controls Smart key with hands-free access and push button start
- Fog Lights
- Fog lights LED front fog lights
- Folding door mirrors Power folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Forward collision warning Forward Collision Warning-Plus
- Four Wheel Drive
- Front License Plate Bracket
- Front Seat Back Map Pockets
- Front anti-roll Front anti-roll bar
- Front camera Front mounted camera
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height and tilt adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front passenger lumbar Front passenger seat with 4-way power lumbar
- Front reading lights
- Front seat upholstery Leather front seat upholstery
- Front seatback upholstery Leatherette front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Fuel Type Regular Unleaded
- Full Length Premium Floor Console
- Full gauge cluster screen
- Garage door opener
- Gauge cluster display size (inches) Gauge cluster display size: 12.00
- Gearshifter material Metal-look gear shifter material
- Glove box Illuminated locking glove box
- Grille style Black grille
- Handsfree Uconnect w/Bluetooth handsfree wireless device connectivity
- Hard Tonneau Cover
- Harman Kardon Stereo
- Head up display Head-up display
- Head-Up Display
- Headlight type Projector beam headlights
- Headlights LED low and high beam headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated Front Seats
- Heated Rear Seats
- Heated Seats
- Heated Second Row Seats
- Heated Steering Wheel
- Heated door mirrors Heated driver and passenger side door mirrors
- Heated front seats Heated driver and front passenger seats
- Heated rear seats
- Heated steering wheel
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill Start Assist
- Hill start assist
- Hybrid
- Ignition Spark ignition system
- Illuminated entry
- Illuminated glove box
- Immobilizer Sentry Key immobilizer
- In-box lighting LED in-box lighting
- Instrumentation display Digital/analog instrumentation display
- Integrated navigation Integrated navigation system with voice activation
- Interior 120V AC power outlets 2 interior 120V AC power outlets
- Interior accents Chrome and metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet access 4G LTE Wi-Fi Hot Spot mobile hotspot internet access
- Internet radio capability
- Key in vehicle warning
- Keyfob cargo controls Keyfob trunk control
- Keyfob keyless entry
- Keyfob remote start
- Keyfob suspension controls Keyfob air suspension control
- Keyless Entry
- Keyless Start
- LED Headlamps
- LED brake lights
- Laminated window Laminated side window glass
- Lane Departure Warning
- Lane Keep Assist
- Lane departure Lane Keep Assist
- Leather
- Leather Seats
- Left camera Left side camera
- License plate front bracket Front license plate bracket
- Limited Level 1
- Limited Level 1 Equipment Group
- Limited Slip Center Differential
- Limited slip differential Mechanical limited slip differential
- Lock-up transmission
- Locking hub control Auto locking hub control
- Locking/Limited Slip Differential
- Low level warnings Low level warning for fuel
- washer fluid and brake fluid
- Low tire pressure warning Tire specific low air pressure warning
- Manufacturer's Statement of Origin
- Memory Seat
- Memory settings Memory settings include: door mirrors
- audio controls and pedals
- Mobile app access RAM App mobile app access
- Multiple headlights Multiple enclosed headlights
- Navigation System
- Night Edition
- Noise cancellation Active noise cancellation
- Number of airbags 6 airbags
- Number of beverage holders 12 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Number of memory settings 2 memory settings
- Occupancy sensor Airbag occupancy sensor
- Oil pressure gauge
- Oil temperature gauge
- One-touch down window Driver and passenger one-touch down windows
- One-touch up window Driver and passenger one-touch up windows
- Over the air updates
- Overdrive transmission
- Overhead airbags Curtain first and second-row overhead airbags
- Overhead console Mini overhead console
- Oversized Premium Wheels 20''+
- Paint Pearlcoat paint
- Panel insert Genuine wood and metal-look instrument panel insert
- Panoramic Power Sunroof
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 8-way directional controls
- Passive Keyless Entry
- Patriot Blue Pearlcoat
- Pedestrian detection Pedestrian Emergency Braking
- Perimeter approach lighting Remote activated perimeter approach lighting
- Power 4-Way Driver Lumbar Adjust
- Power 4-Way Passenger Lumbar Adjust
- Power 8-Way Driver and Passenger Seats
- Power Door Locks
- Power Driver Seat
- Power Driver's Seat
- Power Running Boards
- Power Sliding Rear Window
- Power Steering
- Power Tailgate Release
- Power Windows
- Power driver seat controls Driver seat power reclining
- lumbar support
- cushion tilt
- fore/aft control and height adjustable control
- Power passenger seat controls Passenger seat power reclining
- lumbar support
- cushion tilt
- fore/aft control and height adjustable control
- Powertrain type Hybrid
- Powertrain warranty 60 month/60
- 000 miles
- Premium Leather Trimmed Bucket Seats
- Premium Sound System
- Primary display size 12 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- Push Button Start
- Quick Order Package 27M Limited
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/digital/SiriusXM with 360Lsatellite
- Rain Sensing Front Wipers
- Rain detecting wipers
- Real time traffic Connected Travel & Traffic Services real-time traffic
- Real time weather Connected Travel & Traffic Services real-time weather
- Rear 60/40 Folding Split Recline Seat
- Rear Parking Sensors
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear bumper step
- Rear camera Surround View rear mounted camera
- Rear cargo door Tailgate
- Rear console climate control ducts
- Rear head restraint control 3 rear seat head restraints
- Rear head restraint control Manual rear seat head restraint control
- Rear head restraints Height adjustable rear seat head restraints
- Rear seat check warning Rear Seat Reminder Alert rear seat check warning
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold-up rear seat cushion
- Rear seat upholstery Leather rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats Split-bench rear seat
- Rear seats fixed or removable Fixed rear seats
- Rear step MOPAR retractable rear step
- Rear under seat ducts Rear under seat climate control ducts
- Rear window defroster
- Rear windshield Power rear windshield
- Rearview mirror Auto-dimming rear view mirror
- Reclining rear seats Manual reclining rear seats
- Regenerative brakes
- Remote Engine Starter
- Remote panic alarm
- Right camera Right side camera
- Roadside warranty 60 month/60
- 000 miles
- Running Boards
- Running boards Power running boards
- Running lights LED daytime running lights
- Satellite trial 6 month satellite trial subscription
- Seatback storage pockets 2 seatback storage pockets
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 5
- Second-row windows Power second-row windows
- Security system
- Seek scan
- Selectable mode transmission
- Service interval warning Service interval indicator
- Shock absorbers Heavy-duty gas-pressurized shock absorbers
- Shutters Active grille shutters
- Side Air Bags
- SiriusXM Satellite
- Smart device integration Apple CarPlay/Android Auto smart device wireless mirroring
- Smart device remote start
- Spare tire Full-size spare tire with aluminum wheel
- Spare tire location Crank-down spare tire
- Speakers Harman/kardon speakers
- Speakers number 19 speakers
- Special paint Monotone paint
- Speed sensitive volume
- Speedometer Redundant digital speedometer
- Split front seats Bucket front seats
- Springs front Front air springs
- Springs rear Rear air springs
- Stability Control
- Start-stop engine Auto stop-start engine
- Starter TIP Start hybrid electric motor starter
- Steering Electric power-assist steering system
- Steering mounted audio control Steering wheel mounted audio controls
- Steering type Rack-pinion steering
- Steering wheel material Leather and genuine wood steering wheel
- Steering wheel telescopic Manual telescopic steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Sunroof/Moonroof
- Surround View Camera
- Suspension Standard ride suspension
- Suspension auto correcting Automatic height adjustable suspension with driver control
- Suspension auto-leveling Auto-leveling front and rear suspension
- Suspension control Automatic suspension ride control with driver control
- Suspension ride type front Independent front suspension
- Suspension ride type rear Rigid axle rear suspension
- Suspension type front Short and long arm front suspension
- Suspension type rear Multi-link rear suspension
- Tachometer
- Tailgate control Tailgate/power door lock
- Technology Pkg.
- Temperature display Exterior temperature display
- Tilt & Telescoping Wheel
- Tinted windows Deep tinted windows
- Tire pressure Tire Fill Alert tire pressure fill assist
- Tires P285/45HR22 AS BSW front and rear tires
- Tonneau cover Soft tonneau cover
- Tow Hooks
- Tow hooks front 2 front tow hooks
- Towing Pkg
- Towing brake controller Trailer brake controller
- Towing class Class IV tow rating
- Towing hitch Trailer hitch
- Towing hitch light Trailer hitch light
- Towing trailer sway Trailer sway control
- Towing wiring harness Trailer wiring harness
- Towing/Camper Pkg
- Traction Control
- Traction battery type Lithium ion (Li-ion)
- Traction control All-speed ABS and driveline traction control
- Trailer Brake Control
- Transfer case Electronic transfer case shift
- Transmission 8-speed automatic
- Transmission Type Automatic
- Transmission electronic control
- Transmission fluid temperature warning Transmission fluid temp warning
- Transmission temperature gauge Transmission fluid temperature gauge
- Trip computer
- Trip odometer
- Turn signal in door mirrors Turn signal indicator in door mirrors
- Two-Speed Transfer Case
- USB Port
- USB ports 9 USB ports
- Uconnect
- Uconnect 5 Navigation with 12.0' Display Radio
- Under seat tray rear Rear under seat tray
- V traction battery 48
- V8; HEMI; eTorque; 5.7 Liter
- Valet key
- Variable intake manifold
- Variable panel light Variable instrument panel light
- Ventilated Front Seats
- Ventilated Rear Seats
- Ventilated Seats
- Ventilated brakes Front ventilated disc brakes
- Video rearview mirror Video-feed rearview mirror
- Visor driver mirror Driver visor mirror
- Visor illuminated driver mirror Illuminated driver visor mirror
- Visor illuminated passenger mirror Illuminated passenger visor mirror
- Visor passenger mirror Passenger visor mirror
- Voice activated audio Voice activated audio controls
- Voice recorder Personal voice memo recorder
- Voltmeter
- WIFI Hotspot
- Wheels 22 x 9-inch front and rear black aluminum wheels
- Window Trim Black side window trim
- Wipers Variable intermittent front windshield wipers
- Wireless device charging Front wireless smart device charging
- Wireless streaming Bluetooth wireless audio streaming
- harman/kardon Premium Sound
Seller's Comments
Summary
Rogers Chrysler Jeep Dodge Ram is committed to 100% customer satisfaction, no exceptions. We are honored at the opportunity to earn your business. Welcome to the exclusive Rogers Chrysler Jeep Dodge Ram online vehicle listings.
Vehicle Details
2023 Ram 1500 Limited Lewiston IDs best-priced, low-mileage powerhouse. This exceptional 2023 Ram 1500 Limited pairs rugged capability with refined comfort, featuring a stout V8 5.7L gasoline engine and 4WD to tackle Idaho roads and weekend adventures with confidence. At just 48,937 miles, this premium pickup delivers proven longevity, strong towing performance, and a smooth ride youll notice immediately.
Top-tier Limited trim adds upscale touches and advanced tech: Adaptive Cruise Control makes highway driving effortless, Navigation keeps you on course across Lewiston and beyond, and Hands-Free Bluetooth ensures safe, seamless calling and audio streaming. Safety features include Blind Spot Monitor for lane-change peace of mind and a CARFAX Clean Report verifying a transparent ownership history.
Inside, enjoy leather-appointed seating, intuitive controls, and a spacious cabin built for long drives and daily duties. Outside, commanding presence and durable design reflect Rams commitment to capability and style. Whether you need a dependable work truck, a family hauler, or a weekend tow vehicle, this Ram 1500 Limited checks every box.
Located in Lewiston, ID and priced to sell, this 2023 Ram 1500 Limited represents the best price youll find for a clean, well-equipped V8 4WD pickup in the area. Schedule a test drive today and experience the performance, comfort, and value firsthand.
Equipment
Half ton trucks are the most functional trucks for all purposes. The Ram 1500 has four wheel drive capabilities. Anti-lock brakes will help you stop in an emergency. This 1/2 ton pickup has auto-adjust speed for safe following. Light weight alloy wheels on the Ram 1500 are the perfect compliment to a stylish body. See what's behind you with the back up camera on this model. This vehicle has a durable long lasting bed liner. It enhances safety with a blind spot monitor, alerting drivers to potential dangers in adjacent lanes. This vehicle shines with an exquisite blue finish. Our dealership has already run the CARFAX report and it is clean. A clean CARFAX is a great asset for resale value in the future. This 1/2 ton pickup features cruise control for long trips. The Electronic Stability Control will keep you on your intended path. Know you and your passengers are protected with the front and rear side curtain airbags in this 2023 Ram 1500 . The Ram 1500 has fog lights for all weather conditions. This 2023 Ram 1500 has front air bags that will protect you and your passenger in the event of an accident. The Ram 1500 is equipped with front side curtain airbags. Enjoy the tried and true gasoline engine in this Ram 1500. The hard tonneau cover on this model will keep your load safe, secure and out of the weather. Bluetooth technology is built into this 1/2 ton pickup, keeping your hands on the steering wheel and your focus on the road. Enjoy the heated seats in this 1/2 ton pickup you will never buy a vehicle without them. Everyone loves the comfort of having a warm seat on those cold winter days. With the keyless entry system on this 2023 Ram 1500 you can pop the trunk without dropping your bags from the store. This vehicle stays safely in its lane with Lane Keep Assist. The installed navigation system will keep you on the right path. A front power adjustable seat increases driver comfort. Nothing dresses up a vehicle better than a set of high end premium wheels. The rear parking assist technology on this model will put you at ease when reversing. The system alerts you as you get closer to an obstruction. The premium quality running boards make it easier to get in and out of the vehicle and give it a nice look too. The Ram 1500 h
1824 Main Street
Lewiston, Idaho 83501
(208) 298-9618
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

