 
        Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Entertainment
Premium Sound System
Seating
Heated Seats
Leather Seats
Exterior
Alloy Wheels
LED Headlights
Tow Hitch
Safety
Automatic Emergency Braking
Backup Camera
Blind Spot Monitor
Brake Assist
Stability Control
Rear Cross Traffic Alert
Convenience
Adaptive Cruise Control
Keyless Start
Heated Steering Wheel
Navigation System
Remote Start
Tow Hooks
USB Port
HomeLink
Features
- 120V AC power outlets 3 120V AC power outlets
- 12V power outlets 2 12V power outlets
- 3-point seatbelt Rear seat center 3-point seatbelt
- 4-Wheel Disc Brakes
- 4WD type Part-time 4WD
- 6.7L I6 Cummins Turbo Diesel Engine
- 8 Cylinder Engine
- 8-Speed A/T
- A/C
- ABS
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- AM/FM Stereo
- Accessory power Retained accessory power
- Adaptive Cruise Control
- Adaptive cruise control Adaptive cruise control with stop and go
- Adjustable Steering Wheel
- Air conditioning Yes
- All-in-one key All-in-one remote fob and ignition key
- Alternator Type Alternator
- Altimeter
- Aluminum Wheels
- Ambient lighting
- Amplifier
- Android Auto
- Antenna Integrated roof audio antenna
- Apple CarPlay
- Armrests front center Front seat center armrest
- Armrests front storage Front seat armrest storage
- Armrests rear Rear seat center armrest
- Auto door locks Auto-locking doors
- Auto headlights Auto on/off headlight control
- Auto-Dimming Rearview Mirror
- Automatic Emergency Braking
- Automatic Headlights
- Aux input jack Auxiliary input jack
- Auxiliary Audio Input
- Back-Up Camera
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery run down protection
- Battery type Dual lead acid batteries
- Bed Liner
- Bed-rail protectors Pickup bed-rail protectors
- Beverage holders Illuminated front beverage holders
- Beverage holders rear Rear beverage holders
- Blind Spot Monitor
- Blind spot Blind Spot Detection
- Bluetooth
- Body panels Galvanized steel/aluminum body panels with side impact beams
- Box style Standard style pickup box
- Brake Assist
- Brake assist system
- Brake type 4-wheel disc brakes
- Built-in virtual assistant Alexa Built-In built-in virtual assistant
- Bulb warning Bulb failure warning
- Bumpers front Body-colored front bumper
- Bumpers rear Body-colored rear bumper
- Cabin air filter N95+Bio cabin air filter
- Capless fuel filler
- Child Safety Locks
- Child door locks Manual rear child safety door locks
- Climate Control
- Climate control Automatic climate control
- Clock In-radio display clock
- Compass
- Compressor Intercooled turbo
- Configurable instrumentation gauges
- Conventional Spare Tire
- Convex spotter Power driver and passenger convex spotter mirrors
- Corrosion perforation warranty 60 month/100
- 000 miles
- Cross-Traffic Alert
- Cruise Control
- Cruise control Cruise control with steering wheel mounted controls
- Cylinder head material Iron cylinder head
- DEF fluid gage Diesel exhaust fluid (def) gage
- DRL preference setting
- Day/Night rearview mirror
- Daytime Running Lights
- Delay off headlights Delay-off headlights
- Diesel Engine
- Distance alert Following distance alert
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Body-colored door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Chrome door mirrors
- Door mirror type Power extendable trailer mirrors
- Door mirrors Power door mirrors
- Door panel insert Piano black and metal-look door panel insert
- Drive type Four-wheel drive
- Driver Adjustable Lumbar
- Driver Air Bag
- Driver Illuminated Vanity Mirror
- Driver Vanity Mirror
- Driver information center
- Driver lumbar Driver seat with 2-way power lumbar
- Driver seat direction Driver seat with 8-way directional controls
- Dual Climate Control
- Dual-zone front climate control
- Easy lower tailgate
- Electronic stability control Electronic stability control system with anti-roll
- Emissions ULEV II emissions
- Engine Cummins High Output 6.7L I-6 diesel direct injection
- VVT intercooled turbo
- diesel
- engine with 430HP
- Engine Cylinders Cummins High Output I6
- Engine Immobilizer
- Engine Location Front mounted engine
- Engine Mounting direction Longitudinal mounted engine
- Engine block material Iron engine block
- Engine compartment light
- Engine hour meter
- Engine retarder Engine retarder system
- Engine temperature warning
- Engine/electric motor temperature gage
- Exterior mirror mounted clearance lights
- Exterior mirror spot lights Exterior mirror LED spot lights
- External memory Uconnect external memory control
- First-row windows Power first-row windows
- Floor Mats
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Carpet front and rear floor mats
- Fob engine controls Smart key with hands-free access and push button start
- Fob remote vehicle controls Smart device and keyfob engine start control
- Fog Lamps
- Fog lights LED front fog lights
- Folding door mirrors Power folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Forward collision warning Forward Collision Warning-Plus
- Four Wheel Drive
- Front Head Air Bag
- Front Side Air Bag
- Front anti-roll Front anti-roll bar
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height and tilt adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front passenger lumbar Front passenger seat with 2-way power lumbar
- Front reading lights
- Front seat type Split-bench front seat
- Front seat upholstery Simulated suede and leather front seat upholstery
- Front seatback upholstery Leatherette front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Fuel Type Diesel
- Full gage cluster screen
- Gage cluster display size (inches) Gage cluster display size: 12.00
- Garage door opener
- Gasoline Fuel
- Gearshifter material Urethane gear shifter material
- Glove box Illuminated locking glove box
- Grille style Chrome grille
- Handsfree Uconnect w/Bluetooth handsfree wireless device connectivity
- Headlight type Projector beam headlights
- Headlights LED low and high beam headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated Mirrors
- Heated Seats
- Heated Steering Wheel
- Heated door mirrors Heated driver and passenger side door mirrors
- Heated front seats Heated driver and front passenger seats
- Heated steering wheel
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill start assist
- Ignition Compression ignition system
- Illuminated entry
- Illuminated glove box
- Immobilizer Sentry Key immobilizer
- Inclinometer
- Instrumentation display Digital/analog instrumentation display
- Integrated Turn Signal Mirrors
- Integrated navigation Integrated navigation system with voice activation
- Interior accents Piano black and metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Intermittent Wipers
- Internet access 4G LTE Wi-Fi Hot Spot mobile hotspot internet access
- Internet radio capability
- Key in vehicle warning
- Keyfob door locks Keyfob activated door locks
- Keyless Entry
- Keyless Start
- LED brake lights
- Laminated window Laminated side window glass
- Leather Seats
- Lock-up transmission
- Locking hub control Auto locking hub control
- Low level warnings Low level warning for fuel
- washer fluid
- brake fluid and diesel exhaust fluid (DEF)
- Low tire pressure warning Tire specific low air pressure warning
- MP3 Player
- Mobile app access
- Multi-Zone A/C
- Multiple headlights Multiple enclosed headlights
- Navigation System
- Noise cancellation Active noise cancellation
- Number of airbags 6 airbags
- Number of beverage holders 7 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Occupancy sensor Airbag occupancy sensor
- Oil pressure gage
- Oil temperature gage
- One-touch down window Driver and passenger one-touch down windows
- One-touch up window Driver and passenger one-touch up windows
- Over the air updates
- Overdrive transmission
- Overhead airbags Curtain first and second-row overhead airbags
- Overhead console Mini overhead console
- Overhead console storage
- Paint Clearcoat paint
- Panel insert Piano black and metal-look instrument panel insert
- Parking sensors ParkSense front and rear parking sensors
- Pass-Through Rear Seat
- Passenger Adjustable Lumbar
- Passenger Air Bag
- Passenger Illuminated Visor Mirror
- Passenger Vanity Mirror
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 8-way directional controls
- Pedestrian detection Pedestrian/Cyclist Emergency Braking
- Perimeter approach lighting Remote activated perimeter approach lighting
- Pickup box cargo light
- Power Door Locks
- Power Driver Seat
- Power Mirror(s)
- Power Passenger Seat
- Power Steering
- Power Windows
- Power driver seat controls Driver seat power reclining
- lumbar support
- cushion tilt
- fore/aft control and height adjustable control
- Power passenger seat controls Passenger seat power reclining
- lumbar support
- cushion tilt
- fore/aft control and height adjustable control
- Powertrain type ICE
- Premium Sound
- Premium Sound System
- Primary display size 12 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- Privacy Glass
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/digital/SiriusXM with 360Lsatellite
- Rain Sensing Front Wipers
- Real time traffic Connected Travel & Traffic Services real-time traffic
- Real time weather Connected Travel & Traffic Services real-time weather
- Rear Cross Traffic Alert
- Rear Defrost
- Rear Head Air Bag
- Rear Parking Aid
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear bench seats Split-bench rear seat
- Rear bumper step
- Rear camera Surround View rear mounted camera
- Rear cargo door Tailgate
- Rear collision warning Cross Path Detection collision warning
- Rear console climate control ducts
- Rear head restraint control 3 rear seat head restraints
- Rear head restraint control Manual rear seat head restraint control
- Rear head restraints Height adjustable rear seat head restraints
- Rear reading lights
- Rear seat check warning Rear Seat Reminder Alert rear seat check warning
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold-up rear seat cushion
- Rear seat upholstery Simulated suede and leather rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats fixed or removable Fixed rear seats
- Rear under seat ducts Rear under seat climate control ducts
- Rear window defroster
- Rear windshield Power rear windshield
- Rearview mirror Auto-dimming rear view mirror
- Remote Start
- Remote panic alarm
- Running lights LED daytime running lights
- Satellite Radio
- Satellite trial 6 month satellite trial subscription
- Seatback storage pockets 2 seatback storage pockets
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 6
- Second-row windows Power second-row windows
- Security System
- Security system
- Seek scan
- Selectable mode transmission Tow/Haul Mode selectable mode transmission
- Service interval warning Service interval indicator
- Shock absorbers Heavy-duty shock absorbers
- Shutters Active grille shutters
- Smart Device Integration
- Smart device integration Apple CarPlay/Android Auto smart device wireless mirroring
- Spare tire Full-size spare tire with steel wheel
- Spare tire location Crank-down spare tire
- Speakers Alpine speakers
- Speakers number 10 speakers
- Special paint Monotone paint
- Speed sensitive volume
- Speedometer Redundant digital speedometer
- Split Bench Seat
- Split front seats 40-20-40 split-bench front seat
- Springs front Front coil springs
- Springs rear Rear coil springs
- Stability Control
- Steering Hydraulic power-assist steering system
- Steering Wheel Audio Controls
- Steering cooler
- Steering mounted audio control Steering wheel mounted audio controls
- Steering type Re-circulating ball steering
- Steering type number of wheels 2-wheel steering system
- Steering wheel material Leatherette steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Supplemental cabin heater
- Suspension Heavy-duty ride suspension
- Suspension ride type front Rigid axle front suspension
- Suspension ride type rear Rigid axle rear suspension
- Suspension type front Multi-link front suspension
- Suspension type rear Multi-link rear suspension
- Tachometer
- Tailgate control Tailgate/power door lock
- Tailpipe Stainless steel single exhaust
- Temperature display Exterior temperature display
- Tinted windows Deep tinted windows
- Tire Pressure Monitor
- Tire pressure Tire Fill Alert programmable tire pressure fill assist
- Tires LT275/70SR18 AS BSW front and rear tires
- Tow Hitch
- Tow Hooks
- Tow hooks front 2 front tow hooks
- Towing brake controller Trailer brake controller
- Towing capability Trailer towing capability
- Towing class Class V tow rating
- Towing hitch Trailer hitch
- Towing hitch light Trailer hitch light
- Towing trailer sway Trailer sway control
- Towing wiring harness Trailer wiring harness
- Traction Control
- Traction control All-speed ABS and driveline traction control
- Trailer Hitch
- Trailer light test
- Transfer case Electronic transfer case shift
- Transmission TorqueFlite 8-speed automatic
- Transmission Type Automatic
- Transmission electronic control
- Transmission fluid temperature warning Transmission fluid temp warning
- Transmission temperature gage Transmission fluid temperature gage
- Trip Computer
- Trip computer
- Trip odometer
- Turbo gage Turbo/supercharger boost gage
- Turbocharged
- Turn signal in door mirrors Turn signal indicator in door mirrors
- Two-Speed Transfer Case
- USB Port
- USB ports 9 USB ports
- Under seat tray front Front under seat tray
- Under seat tray rear Rear under seat tray
- Universal Garage Door Opener
- Valet key
- Variable Speed Intermittent Wipers
- Variable intake manifold
- Variable panel light Variable instrument panel light
- Ventilated brakes Front and rear ventilated disc brakes
- Visor driver mirror Driver visor mirror
- Visor illuminated driver mirror Illuminated driver visor mirror
- Visor illuminated passenger mirror Illuminated passenger visor mirror
- Visor passenger mirror Passenger visor mirror
- Voice activated audio Voice activated audio controls
- Voice recorder Personal voice memo recorder
- Voltmeter
- WIFI Hotspot
- Wheel covers Wheel hub covers
- Wheels 20 x 8-inch front and rear black aluminum wheels
- Wheels 20 x 8-inch front and rear polished aluminum wheels
- WiFi Hotspot
- Window Trim Black side window trim
- Windshield trim Black windshield trim
- Wipers Variable intermittent front windshield wipers
- Wireless streaming Wireless audio streaming
Seller's Comments
KEY FEATURES INCLUDE
Navigation, 4x4, Heated Driver Seat, Premium Sound System, Satellite Radio Ram Laramie with Granite Crystal Metallic Clearcoat exterior and Black interior features a Straight 6 Cylinder Engine with 430 HP at 2800 RPM*. 
OPTION PACKAGES
ENGINE: 6.7L I6 CUMMINS TURBO DIESEL Selective Catalytic Reduction (Urea), Dual 730 Amp Maintenance Free Batteries, Cummins Turbo Diesel Badge, Heavy Duty Engine Cooling, Diesel Exhaust Brake, Supplemental Heater, 3.42 Axle Ratio, Front Bumper Sight Shields, Capless Fuel Fill w/o Discriminator, GVWR: 10,190 lbs, NIGHT EDITION Tires: LT285/60R20E OWL On/Off Road, Black Exterior Truck Badging, Wheels: 20 x 8.0 Black Painted Aluminum, Gloss Black Grille Billets/Accents, Body Color Grille Surround, Sport Performance Hood, Black Exterior Mirrors, LARAMIE LEVEL 1 PLUS EQUIPMENT GROUP CTR Stop Lamp w/Cargo View Camera, Rain Sensitive Windshield Wipers, Power Adjustable Pedals w/Memory, LED Bed Lighting, Traffic Sign Recognition, Auto Power-Folding Mirrors, Adaptive Steering System, Auto Dim Exterior Mirror, Anti-Spin Differential Rear Axle, Heated Second Row Seats, Drowsy Driver Detection, MOPAR Deployable Bed Step, Foam Bottle Insert (Door Trim Panel), Active Lane Management System, Power Heated Fold Telescopic Mirrors w/Memory, Remote Tailgate Release, MOPAR Spray In Bedliner, Auto High Beam Headlamp Control, Chrome Exterior Mirrors, Exterior Mirrors w/Memory, 2nd Row In Floor Storage Bins, Auto Dim Exterior Passenger Mirror, Auto Adjust In Reverse Exterior Mirrors, MOPAR FRONT & REAR RUBBER FLOOR MATS, TRANSMISSION: AUTOMATIC, BLACK, LEATHER TRIMMED BUCKET SEATS Bucket Seats, Dual Wireless Charging Pad, #1 Seat Foam Cushion, Full Length Upgraded Floor Console, TOWING TECHNOLOGY GROUP CTR Stop Lamp w/Cargo View Camera, Surround View Camera System, Trailer Tire Pressure Monitoring System, Trailer Reverse Guidance. 
OUR OFFERINGS
Lets face it: the car buying experience is a big decision. That is why the sales team at Hertrich Chrysler Dodge Jeep Ram of Pocomoke strives to a hassle free customer experience. Feel free to browse our new and pre-owned inventories of Chrysler, Dodge and Jeep vehicles. Our full service dealership is located in Pocomoke City, MD, and we strive for every customer to leave satisfied, no matter what automotive service is required. Call us today at (888) 355-3496 to learn more. 
Horsepower calculations based on trim engine configuration. Please confirm the accuracy of the included equipment by calling us prior to purchase. 
1618 Ocean Highway
Pocomoke City, Maryland 21851
(410) 957-3333
Similar Vehicles
 
                 
                 
                All New vehicle Hertrich Sales Pricing includes all available manufacture incentives. Residency restrictions may apply. All vehicle pricing excludes tax, tags, and dealer doc fee of $799 in Delaware, $799 in Maryland (not required by law), and $349 in New Jersey. Due to current market conditions, final price may be higher than MSRP (Manufacturers Suggested Retail Price). We make every effort to provide accurate information, but please verify options and price before purchasing. All vehicles are subject to prior sale.. All prices are special internet prices only. All financing is subject to approved credit. While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions contained on these pages. Please verify any information in question with The Hertrich Family of Automobile Dealerships.
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.
 Dealer Reviews
 Dealer Reviews Cars for Sale
 Cars for Sale

 
                                    
 Dealer Log In
 Dealer Log In 
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                            
 
                 
                 
                
 
             
            




