Powered by Cars.com

2026 Ram 1500

$76,590new

MSRP: $76,590

Contact Dealership

Basics

Condition

new

Interior Color

black

Exterior Color

bright white clearcoat

Drivetrain

Four-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

Hurricane 3L I-6 gasoline direct injection, DOHC, variable valve

VIN

1C6SRFUP9TN370497

Stock Number

9942R

Mileage

0

Features

Seating

Heated Seats

Leather Seats

Exterior

Alloy Wheels

LED Headlights

Tow Hitch

Convenience

Adaptive Cruise Control

Keyless Start

Navigation System

Heated Steering Wheel

Remote Start

Tow Hooks

USB Port

Safety

Automatic Emergency Braking

Backup Camera

Blind Spot Monitor

Brake Assist

Stability Control

Lane Departure Warning

Rear Cross Traffic Alert

View Full List of Features

Seller's Comments

Recent Arrival!Quick Order Package 22Y RHO, 10 Speakers, 3.92 Rear Axle Ratio, 4-Wheel Disc Brakes, 4G LTE Wi-Fi Hot Spot, ABS brakes, Adaptive suspension, Adjustable pedals, Air Conditioning, Alloy wheels, AM/FM radio, Apple CarPlay/Android Auto, Auto High-beam Headlights, Auto Power-Folding Mirrors, Auto-dimming door mirrors, Auto-Dimming Exterior Driver Mirror, Auto-dimming Rear-View mirror, Automatic temperature control, Brake assist, Compass, Connected Travel and Traffic Services, Connectivity - US/Canada, Delay-off headlights, Disassociated Touchscreen Display, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Exterior Mirrors Courtesy Lamps, Exterior Mirrors with Heating Element, Exterior Mirrors with Supplemental Signals, Exterior Parking Camera Rear, Flareside Box, Front anti-roll bar, Front Bucket Seats, Front Center Armrest w/Storage, Front dual zone A/C, Front fog lights, Front License Plate Bracket, Front reading lights, Front wheel independent suspension, Fully automatic headlights, Garage door transmitter, GPS Navigation, HD Radio, Heated door mirrors, Heated front seats, Heated steering wheel, Illuminated entry, Integrated Center Stack Radio, Integrated Voice Command with Bluetooth, Leather Shift Knob, Leather steering wheel, Leather Trimmed Bucket Seats, Low tire pressure warning, Manufacturer's Statement of Origin, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power passenger seat, Power steering, Power windows, Radio data system, Radio: Uconnect 5 Navigation with 12.0'' Display, Rear reading lights, Rear seat center armrest, Rear step bumper, Rear window defroster, Remote keyless entry, Security system, SiriusXM Radio Service, Speed control, Split folding rear seat, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, USB Host Flip, Variably intermittent wipers, Voltmeter, and Wheels: 18'' x 9'' Black Paint/Polish Aluminum.2026 Ram 1500 RHO Bright White Clearcoat

Contact J Star Chrysler Dodge Jeep Ram of Anaheim Hills

Call (714) 989-6982

J Star Chrysler Dodge Jeep Ram of Anaheim Hills
4.7 |
689 Lifetime Reviews

8200 E Crystal Dr

Anaheim, California 92807

(714) 989-6982

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

used 2025 Ram 1500 car, priced at $73,900
2025 Ram 1500
used
Diamond Black Crystal Pearlcoat exterior
Automatic
Four-wheel Drive
new 2026 Ram 1500 car, priced at $71,405
2026 Ram 1500
new
Canyon Lake exterior
Automatic
Four-wheel Drive
new 2026 Ram 1500 car, priced at $88,000
2026 Ram 1500
new
Bright White Clearcoat exterior
Automatic
Four-wheel Drive
new 2026 Ram 1500 car, priced at $65,153
2026 Ram 1500
new
Diamond Black Crystal Pearlcoat exterior
Automatic
Four-wheel Drive
new 2026 Ram 1500 car, priced at $53,815
2026 Ram 1500
new
Diamond Black Crystal Pearlcoat exterior
Automatic
Four-wheel Drive
new 2026 Ram 1500 car, priced at $58,372
2026 Ram 1500
new
Silver Zynith exterior
Automatic
Four-wheel Drive

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.