Powered by Cars.com

2020 Hyundai Ioniq Hybrid

$14,995used

Contact Dealership

Basics

Condition

used

Interior Color

dark gray

Exterior Color

summit gray

Drivetrain

Front-wheel Drive

Transmission

Automatic

Fuel

Hybrid

Engine

1.6L I4 16V GDI DOHC Hybrid

VIN

KMHC75LC9LU208186

Stock Number

208186

Mileage

78,806

Features

Exterior

Alloy Wheels

Seating

Heated Seats

Convenience

USB Port

Keyless Start

Remote Start

Safety

Brake Assist

Stability Control

Backup Camera

Lane Departure Warning

Rear Cross Traffic Alert

View Full List of Features

Seller's Comments

Recent Arrival! I4, Alloy wheels, Heated Front Bucket Seats, Premium Cloth Seating Surfaces. Option Group 01, I4, Alloy wheels, Heated Front Bucket Seats, Premium Cloth Seating Surfaces, 4-Wheel Disc Brakes, 6 Speakers, ABS brakes, Air Conditioning, AM/FM radio: SiriusXM, Apple CarPlay & Android Auto, Auto High-beam Headlights, Automatic temperature control, Bodyside moldings, Brake assist, Bumpers: body-color, Cargo Cover, Cargo Net, Cargo Tray, Carpeted Floor Mats, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: Blue Link Connected Care (3-year subscription), Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Fully automatic headlights, Heated door mirrors, Heated front seats, Illuminated entry, Knee airbag, Leather Shift Knob, Low tire pressure warning, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power steering, Power windows, Radio: AM/FM Display Audio, Rear Bumper Applique, Rear seat center armrest, Rear window defroster, Remote keyless entry, Security system, Speed control, Speed-sensing steering, Split folding rear seat, Spoiler, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, and Variably intermittent wipers. Come by National Auto of Waldorf and ride away in a sweet ride. Please call us at 240-585-7300 to schedule a test drive. All prices exclude taxes, tags, dealer processing fees and Certification. Every CERTIFIED PRE-OWNED vehicle receives 84 month or 100,000 miles powertrain warranty.

Contact National Auto of Waldorf

Call (877) 231-2775

National Auto of Waldorf
0 |
81 Lifetime Reviews

2183 Crain Hwy

Waldorf, Maryland 20601

(877) 231-2775

Looking for someone to work with?

View salespeople at this dealership

The advertised price is the price for the vehicle in its current condition and subject to change depending on market fluctuation and/or additional costs incurred by the dealer and does not include sales tax, vehicle registration fees, cost of additional requests by customer, finance charges, processing charges, and any other fees required by law. The processing fees in Maryland is $800 (not required by law). We attempt to update our inventory on a regular basis. However, there can be lag time between the sale of a vehicle and the update of inventory. EPA mileage estimates are for newly manufactured vehicles only. Your actual mileage will vary depending on how you drive and maintain your vehicle. The default estimated Monthly Payment Labeled “Finance Payment” shown under the “Finance” Tab is a tool used for estimating payment amounts only. Values displayed are estimates for illustrative purposes only and are based, where applicable, on the information you enter. APR and terms used in the estimate do not constitute an advertisement, a request for specific credit terms, or an offer of credit. The actual financing terms may vary based on your credit, the vehicle financed, and lender policies. Financing is subject to credit approval. Tax, registration fees, processing fee, and other fees required by law vary by state and will be calculated at the time of purchase. APR and terms used in estimates may not be applicable to you. The default Estimated Monthly Payment is calculated using 11.11% APR, $2,000 Down Payment, 72 Month Loan Term and includes Maryland processing fee of $800 (not required by law) and estimated taxes and additional fees based on your set location. Click vehicle to view detailed pricing and customize your financing terms. The terms of the written agreement between you and the dealership supersede any information contained in this website and are binding upon you notwithstanding any other information contained herein. Before purchasing this vehicle, it is your responsibility to address any and all differences between information on this website and the actual vehicle specifications and/or any warranties offered prior to the sale of the advertised vehicle. Vehicle data on this website is compiled from publicly available sources believed by the publisher (which is not our dealership) to be reliable, but we encourage you to perform your own investigation prior to any purchase. Vehicle data is subject to change without notice. 72 monthly payments of $20 per thousand borrowed. Additional taxes, registration and license fees may apply for out of state purchasers based on their registration address. Taxes are estimates. The dealership will help determine accurate taxes prior to delivery. Fuel Economy values are estimates and based on model year EPA mileage ratings. Use for comparison purposes only. Your actual mileage will vary, depending on how you drive and maintain your vehicle, driving conditions, battery pack age/condition (hybrid models only) and other factors. Click the price details link to view detailed pricing breakdown. While National auto of Waldorf tries to make sure all information posted here is accurate, we cannot be responsible for typographical and other errors (e.g., data transmission) that may appear on the site. If the posted price (including finance and lease payments) for a vehicle is incorrect, National auto of Waldorf will endeavor to provide you with the correct prices as soon as we become aware of the error. In the event a vehicle is priced incorrectly, National auto of Waldorf shall have the right to refuse or cancel any orders placed for the vehicle presented with the incorrect price. In addition, vehicle prices are subject to change and all vehicles are subject to prior sale and may not be available when you are ready to purchase.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.