Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Exterior
LED Headlights
Tow Hitch
Safety
Automatic Emergency Braking
Backup Camera
Brake Assist
Stability Control
Convenience
Adaptive Cruise Control
Keyless Start
Navigation System
USB Port
Tow Hooks
Features
- 115V Auxiliary Front Power Outlet
- 12' Touchscreen Display
- 12.0' Single Rear Wheel Axle
- 12V power outlets 2 12V power outlets
- 2 Way Rear Headrest Seat
- 3-point seatbelt Rear seat center 3-point seatbelt
- 3.42 Axle Ratio
- 3.73 Axle Ratio
- 4 Way Front Headrests
- 4-Wheel Disc Brakes
- 40/20/40 Split Bench Seat
- 400W Inverter
- 4G LTE Wi-Fi Hot Spot
- 4WD type Part-time 4WD
- 50 Gallon Fuel Tank
- 50 State Emissions
- 6 Speakers
- 6.7L I6 Cummins HO Turbo Diesel Engine
- 8-Speed TorqueFlite HD Automatic Transmission
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- ABS brakes
- AM/FM radio: SiriusXM
- Accessory power Retained accessory power
- Adaptive Cruise Control
- Adaptive cruise control Adaptive cruise control with stop and go
- Adjustable head restraints: driver and passenger w/tilt
- Air Conditioning
- Air Conditioning ATC w/Dual Zone Control
- Air conditioning Yes
- Alexa Built-In
- Alternator Type Alternator
- Altimeter
- Android Auto
- Antenna Integrated roof audio antenna
- Apple CarPlay
- Apple CarPlay/Android Auto
- Armrests front center Front seat center armrest
- Armrests front storage Front seat armrest storage
- Auto door locks Auto-locking doors
- Auto headlights Auto on/off headlight control
- Auto-Dimming Rear-View Mirror
- Automatic Emergency Braking
- Aux input jack Auxiliary input jack
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery run down protection
- Battery type Dual lead acid batteries
- Bed-rail protectors Pickup bed-rail protectors
- Beverage holders Illuminated front beverage holders
- Beverage holders rear Rear beverage holders
- Black
- Black Exterior Mirrors
- Black Wheel Center Hub
- Body panels Galvanized steel/aluminum body panels with side impact beams
- Box style Standard style pickup box
- Brake Assist
- Brake assist
- Brake assist system
- Brake type 4-wheel disc brakes
- Bright Front Bumper
- Bright Rear Bumper
- Built-in virtual assistant Alexa Built-In built-in virtual assistant
- Bulb warning Bulb failure warning
- Bumpers front Chrome front bumper
- Bumpers rear Chrome rear bumper
- Cabin air filter N95+Bio cabin air filter
- Capless Fuel Fill w/o Discriminator
- Capless fuel filler
- Carpet Floor Covering
- Child door locks Manual rear child safety door locks
- Chrome Grille Surround
- Clearance Lamps
- Clearance lights Cab clearance lights
- Climate control Automatic climate control
- Clock In-radio display clock
- Cloth 40/20/40 Bench Seat
- Compass
- Compressor Intercooled turbo
- Connected Travel & Traffic Services
- Connectivity - US/Canada
- Convenience Group
- Convex spotter Power driver and passenger convex spotter mirrors
- Corrosion perforation warranty 60 month/100
- 000 miles
- Cruise control Cruise control with steering wheel mounted controls
- Cummins Turbo Diesel Badge
- Current Generation Engine Controller
- Cylinder head material Iron cylinder head
- DEF fluid gage Diesel exhaust fluid (def) gage
- DRL preference setting
- Dash Pass Thru Wire Circuits
- Day/Night rearview mirror
- Delay off headlights Delay-off headlights
- Delay-off headlights
- Diamond Black Crystal PC
- Diesel Engine
- Diesel Exhaust Brake
- Disassociated Touchscreen Display
- Distance alert Following distance alert
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Black door handles
- Door locks Power door locks
- Door mirror style Black door mirrors
- Door mirror type Manual extendable trailer mirrors
- Door mirrors Power door mirrors
- Drive type Four-wheel drive
- Driver door bin
- Driver information center
- Driver seat direction Driver seat with 4-way directional controls
- Dual 730 Amp Maintenance Free Batteries
- Dual Climate Control
- Dual front impact airbags
- Dual front side impact airbags
- Dual-zone front climate control
- Electronic Stability Control
- Electronic stability control Electronic stability control system with anti-roll
- Emergency SOS RAM Connect vehicle integrated emergency SOS system
- Emergency Vehicle Alert System (EVAS)
- Emissions LEV II emissions
- Engine Cummins High Output 6.7L I-6 diesel direct injection
- VVT intercooled turbo
- diesel
- engine with 430HP
- Engine Cylinders Cummins High Output I6
- Engine Location Front mounted engine
- Engine Mounting direction Longitudinal mounted engine
- Engine block material Iron engine block
- Engine hour meter
- Engine retarder Engine retarder system
- Engine temperature warning
- Engine/electric motor temperature gage
- Exterior 115V AC Outlet
- Exterior Mirrors Courtesy Lamps
- Exterior Mirrors w/Heating Element
- Exterior Mirrors w/Supplemental Signals
- Exterior mirror mounted clearance lights
- External memory Uconnect external memory control
- First-row windows Power first-row windows
- Floor console Partial floor console
- Floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Fob engine controls Smart key with push button start
- Fog lights LED front fog lights
- Folding door mirrors Manual folding door mirrors
- Folding rear seats Full folding rear seats
- For Details Visit DriveUconnect.com
- For More Info Call 800-643-2112
- Forward collision warning Forward collision mitigation with pedestrian impact prevention
- Four Wheel Drive
- Front & Rear Floor Mats
- Front Armrest w/Cupholders
- Front Armrest with Cupholders
- Front Bumper Sight Shields
- Front Center Armrest w/Storage
- Front License Plate Bracket
- Front anti-roll Front anti-roll bar
- Front anti-roll bar
- Front fog lights
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height and tilt adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front reading lights
- Front seat type Split-bench front seat
- Front seat upholstery Cloth front seat upholstery
- Front seatback upholstery Cloth front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Fuel Type Diesel
- Fully automatic headlights
- GPS Antenna Input
- GPS Navigation
- Gage cluster display size (inches) Gage cluster display size: 3.50
- Gearshifter material Urethane gear shifter material
- Global Telematics Box Module (TBM)
- Glove box Standard glove box
- Google Android Auto
- Grille style Black grille with chrome surround
- HD Radio
- HD Vinyl 40/20/40 Split Bench Seat
- Handsfree Uconnect w/Bluetooth handsfree wireless device connectivity
- Headlight type Reflector headlights
- Headlights LED low and high beam headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated door mirrors Heated driver and passenger side door mirrors
- Heavy-Duty Engine Cooling
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill start assist
- I/P Mounted Auxiliary Switches
- Ignition Compression ignition system
- Illuminated entry
- Immobilizer Sentry Key immobilizer
- Inclinometer
- Instrument Panel Mounted Auxiliary Switches
- Instrumentation display Analog instrumentation display
- Integrated Voice Command w/Bluetooth
- Integrated navigation Integrated navigation system with voice activation
- Interior accents Chrome and metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet access 4G LTE Wi-Fi Hot Spot mobile hotspot internet access
- Internet radio capability
- Key in vehicle warning
- Keyless Start
- LT275/70R18E BSW All Season Tires
- License plate front bracket Front license plate bracket
- Limited Slip Center Differential
- Limited slip differential Mechanical limited slip differential
- Lock-up transmission
- Locking hub control Auto locking hub control
- Low level warnings Low level warning for fuel
- washer fluid
- brake fluid and diesel exhaust fluid (DEF)
- Low tire pressure warning
- Low tire pressure warning Tire specific low air pressure warning
- MOPAR Front & Rear Rubber Floor Mats
- MOPAR Front and Rear Rubber Floor Mats
- Manual Adjust 4-Way Driver Seat
- Manual Adjust 4-Way Front Passenger Seat
- Manual Folding Exterior Mirrors
- Manual Telescoping Mirrors
- Manual driver seat controls Driver seat manual reclining and fore/aft control
- Manual passenger seat controls Passenger seat manual reclining and fore/aft control
- Manufacturer's Statement of Origin
- Matte Black Mesh w/Chrome Grille
- Mirror Running Lights
- Mobile app access RAM Connect App mobile app access
- Mopar Black Tubular Side Steps
- Multiple headlights Multiple enclosed headlights
- Noise cancellation Active noise cancellation
- Number of airbags 6 airbags
- Number of beverage holders 5 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Occupancy sensor Airbag occupancy sensor
- Occupant sensing airbag
- Off-Road Information Pages
- Oil pressure gage
- Oil temperature gage
- One-touch down window Driver and passenger one-touch down windows
- One-touch up window Driver and passenger one-touch up windows
- Outside temperature display
- Over the air updates
- Overdrive transmission
- Overhead airbag
- Overhead airbags Curtain first and second-row overhead airbags
- Overhead console
- Overhead console Mini overhead console
- Paint Pearlcoat paint
- Panel insert Metal-look instrument panel insert
- ParkSense Front/Rear Park Assist System
- ParkView Rear Back-Up Camera
- Parking sensors ParkSense front and rear parking sensors
- Passenger door bin
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 4-way directional controls
- Passenger vanity mirror
- Pedestrian detection Pedestrian impact prevention
- Perimeter approach lighting Remote activated perimeter approach lighting
- Pickup box cargo light
- Power Adjust Mirrors
- Power Heat Fold Telescopic Mirrors
- Power steering
- Power windows
- Power-Adjustable Convex Aux Mirrors
- Powertrain type ICE
- Powertrain warranty 60 month/100
- 000 miles (FLT)
- Primary display size 12 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- Quick Order Package 24A Tradesman
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/SiriusXM with 360Lsatellite
- Radio AM/FM/digital/SiriusXMsatellite
- Radio data system
- Radio: Uconnect 5 Nav w/12.0' Display
- Radio: Uconnect 5 w/8.4' Display
- Real time traffic Connected Travel & Traffic Services real-time traffic
- Real time weather Connected Travel & Traffic Services real-time weather
- Rear Folding Seat
- Rear Power Sliding Window
- Rear Springs Heavy-duty rear springs
- Rear Wheelhouse Liners
- Rear bench seats Rear bench seat
- Rear bumper step
- Rear camera ParkView rear mounted camera
- Rear cargo door Tailgate
- Rear console climate control ducts
- Rear head restraint control 3 rear seat head restraints
- Rear head restraint control Manual rear seat head restraint control
- Rear head restraints Height adjustable rear seat head restraints
- Rear seat check warning Rear Seat Reminder Alert rear seat check warning
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold-up rear seat cushion
- Rear seat upholstery Cloth rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats fixed or removable Fixed rear seats
- Rear step bumper
- Rear under seat ducts Rear under seat climate control ducts
- Rear windshield Power rear windshield
- Rearview mirror Auto-dimming rear view mirror
- Remote USB Port - Charge Only
- Roadside warranty 60 month/100
- 000 miles
- Running lights Daytime running lights
- Satellite trial 6 month satellite trial subscription
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 6
- Second-row windows Power second-row windows
- Seek scan
- Selectable Tire Fill Alert
- Selectable mode transmission
- Selective Catalytic Reduction (Urea)
- Service interval warning Service interval indicator
- Shock absorbers Heavy-duty shock absorbers
- Shutters Active grille shutters
- Side steps Side assist steps
- SiriusXM Radio Service
- SiriusXM w/360L
- Smart device integration Apple CarPlay/Android Auto smart device wireless mirroring
- Spare tire Full-size spare tire with steel wheel
- Spare tire location Crank-down spare tire
- Speakers Standard grade speakers
- Speakers number 6 speakers
- Special paint Monotone paint
- Speed control
- Speed sensitive volume
- Split front seats 40-20-40 split-bench front seat
- Springs front Front coil springs
- Springs rear Rear leaf springs
- Stability Control
- Steering Hydraulic power-assist steering system
- Steering cooler
- Steering type Re-circulating ball steering
- Steering type number of wheels 2-wheel steering system
- Steering wheel material Urethane steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Storage Tray
- Supplemental Heater
- Supplemental cabin heater
- Suspension Standard ride suspension
- Suspension ride type front Rigid axle front suspension
- Suspension ride type rear Rigid axle rear suspension
- Suspension type front Multi-link front suspension
- Suspension type rear Leaf spring rear suspension
- Tachometer
- Tailgate control Manual tailgate/rear door lock
- Tailpipe Stainless steel single exhaust
- Temperature display Exterior temperature display
- Tilt steering wheel
- Tinted Acoustic Windshield Glass
- Tinted windows Deep tinted windows
- Tire pressure Tire Fill Alert programmable tire pressure fill assist
- Tires LT275/70SR18 AS BSW front and rear tires
- Tow Hooks
- Tow hooks front 2 front tow hooks
- Towing brake controller Trailer brake controller
- Towing capability Trailer towing capability
- Towing class Class V tow rating
- Towing hitch Trailer hitch
- Towing hitch light Trailer hitch light
- Towing trailer sway Trailer sway control
- Towing wiring harness Trailer wiring harness
- Traction Control
- Traction control
- Traction control All-speed ABS and driveline traction control
- Tradesman Level 2 Equipment Group
- Trailer Tow Pages
- Trailer light test
- Transfer case Electronic transfer case shift
- Transmission TorqueFlite 8-speed automatic
- Transmission Type Automatic
- Transmission Warranty 36 month/180
- 000 miles
- Transmission electronic control
- Transmission fluid temperature warning Transmission fluid temp warning
- Transmission temperature gage Transmission fluid temperature gage
- Trip odometer
- Turbo gage Turbo/supercharger boost gage
- Turbocharged
- Turn signal in door mirrors Turn signal indicator in door mirrors
- Two-Speed Transfer Case
- USB Port
- USB ports 5 USB ports
- Under seat tray rear Rear under seat tray
- Upfitter switches
- Variable panel light Variable instrument panel light
- Variably intermittent wipers
- Vehicle tracker RAM Connect vehicle tracker
- Ventilated brakes Front and rear ventilated disc brakes
- Visor passenger mirror Passenger visor mirror
- Voice activated audio Voice activated audio controls
- Voice recorder Personal voice memo recorder
- Voltmeter
- WIFI Hotspot
- Wheel covers Chrome-clad wheel covers
- Wheels 18 x 8-inch front and rear styled steel wheels
- Wheels: 18' x 8.0' Black Painted Steel
- Window Trim Black side window trim
- Windshield trim Black windshield trim
- Wipers Variable intermittent front windshield wipers
- Wireless streaming Bluetooth wireless audio streaming
Seller's Comments
NAVIGATION! BACKUP CAMERA! This 2025 RAM 3500 TRADESMAN CREW CAB 4X4 LONG BOX TRUCK includes the following features: Package: 24A , Exterior Color: Diamond Black Crystal Pearl Coat Exterior Paint , Interior Color: Black Cloth 40/20/40 Bench Seat , Engine: 6.7L I6 Cummins HO Turbo Diesel Engine , Transmission: 8 Speed TorqueFlite HD AutomaticTransmission , Full Speed Forward Collision Warning Plus , Adaptive Cruise Control with Stop , ParkView Rear Back Up Camera , Sentry Key Theft Deterrent System , Uconnect 5 with 8.4 Inch Touch Screen Display , Google Android Auto , Apple CarPlay , Locking Tailgate , As well as the following options: ParkSense Front and Rear Park Assist System , Uconnect 5 Nav with 12.0 Inch Touch Screen Display , and much more! Please check the window sticker for a complete list of equipment. Kernersville Chrysler Dodge Jeep Ram in Kernersville, NC is located in the heart of North Carolina between Charlotte, NC and Raleigh, NC. We specialize in NO hassle out of state purchases we process your taxes, tags and title work for the city and state where the vehicle will be registered. RETURN TO TOP
View More950 North Carolina 66
Kernersville, North Carolina 27284
(336) 996-4111
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
The selling price includes all applicable rebates. Please note that rebates and incentives are subject to change without notice and may vary based on your ZIP code. For complete details, contact our team. Actual vehicle mileage may vary. Taxes, tags, and a $899.50 documentation fee are additional. All sales are contingent upon passing the North Carolina state inspection.
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

