Powered by Cars.com

2026 GMC Terrain

$32,497used

Contact Dealership

Basics

Condition

used

Interior Color

after dark

Exterior Color

volcanic red tintcoat

Drivetrain

All-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

1.5L I-4 gasoline direct injection, DOHC, variable valve control

VIN

3GKALUEG7TL108152

Stock Number

108152

Mileage

3,888

Features

Seating

Heated Seats

Exterior

LED Headlights

Alloy Wheels

Convenience

Adaptive Cruise Control

Keyless Start

Heated Steering Wheel

Navigation System

Remote Start

USB Port

Safety

Automatic Emergency Braking

Backup Camera

Blind Spot Monitor

Brake Assist

Stability Control

Lane Departure Warning

Rear Cross Traffic Alert

View Full List of Features

Seller's Comments

VEHICLE OVERVIEWThe 2026 GMC Terrain Elevation AWD combines confident allweather capability with a bold, modern design that stands out through its distinctive blackedout accents and athletic stance. Its AWD system enhances stability and traction across varying road conditions, while the refined suspension delivers a smooth and composed ride. Inside, the cabin offers a clean, comfortable environment with intuitive technology and versatile seating that adapts easily to daily needs. The overall experience feels polished and contemporary, giving the Terrain Elevation AWD a strong sense of presence and practicality.ESTIMATED REMAINING COVERAGE (Based on Carfax)BASIC WARRANTY: 26 months or 32,112 miles POWERTRAIN WARRANTY: 50 months or 56,112 miles EMISSIONS WARRANTY: 14 months or 20,112 miles CORROSION WARRANTY: 26 months or 32,112 milesFEATURESOne OwnerAWDBack-Up CameraBluetooth Connection1.5L turbo DOHC 4cylinder engine8speed automatic transmissionEPA fuel economy: 25 MPG combined (24 city / 28 highway)Enhanced Automatic Emergency BrakingFront Pedestrian & Bicyclist BrakingEnhanced Lane Keep Assist with Lane Departure WarningForward Collision AlertIntelliBeam® auto high beamRear CrossTraffic BrakingRear Park AssistBlind Zone Steering AssistSafety Alert SeatAdaptive Cruise ControlPremium GMC Infotainment System with 11inch LCD displayWireless Apple CarPlay® & Android Auto™USB ports11inch Driver Information CenterAfter Dark interiorHeated bucket seatsHeated steering wheelCortec seating (Elevation Premium Package)8way power driver seat with 2way lumbarDualzone automatic climate control*** Based on CarFax as of 4/30/2026. Remaining warranty may be different at the time of sale based on additional age and mileage since publication, warranty and usage history, or inaccuracies on CarFax. Additionally, some warranties are limited to first owners only and are non-transferable. Please verify warranty coverage with the vehicle manufacturer prior to purchase.***

Contact Carvision.com - Maple Shade

Call (856) 272-0138

Carvision.com - Maple Shade
4.9 |
2,928 Lifetime Reviews

2791 NJ-73

Maple Shade, New Jersey 08052

(856) 272-0138

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

used 2023 GMC Terrain car, priced at $22,998
2023 GMC Terrain
used
Marine Metallic exterior
Automatic
Front-wheel Drive

Price includes all costs to be paid by the consumer, except for licensing, registration and taxes. Price assumes that final purchase and registration will be made in the state of New Jersey, unless vehicle is non-transferable. Registrations out of the store state are subject to a $249 adjustment. Car Vision reserves the right to change and update vehicle information including price at any time. You may not qualify for the offers, incentives, discounts, or financing. Car Vision does not accept outside financing from any financial institution. If you would like to finance the purchase of your vehicle, Car Vision can assist you in arranging financing with one of its partner lending institutions.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.