Powered by Cars.com

2026 Nissan Sentra

$23,605new

MSRP: $24,385

Contact Dealership

Basics

Condition

new

Interior Color

charcoal

Exterior Color

gun metallic

Drivetrain

Front-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

2L I-4 gasoline direct injection, DOHC, variable valve control,

VIN

3N1AB9BV1TY210017

Stock Number

S10017

Mileage

0

Features

Exterior

LED Headlights

Convenience

Adaptive Cruise Control

Keyless Start

USB Port

Safety

Automatic Emergency Braking

Backup Camera

Blind Spot Monitor

Brake Assist

Stability Control

Lane Departure Warning

Rear Cross Traffic Alert

View Full List of Features

Seller's Comments

Delivers 40 Highway MPG and 30 City MPG! This Nissan Sentra boasts a Regular Unleaded I-4 2.0 L/122 engine powering this Variable transmission. GUN METALLIC, CHARCOAL, CLOTH SEAT TRIM, [L92] FLOOR MAT PACKAGE -inc: carpeted floor mats and carpeted trunk mat.* This Nissan Sentra Features the Following Options *Wireless Phone Connectivity, Window Grid Antenna, Wheels: 16' Steel w/Full Wheel Covers, Wheels w/Black Accents w/Full Wheel Covers, Variable Intermittent Wipers, Urethane Gear Shifter Material, Trunk Rear Cargo Access, Trip Computer, Transmission: Xtronic Continuously Variable (CVT), Transmission w/Driver Selectable Mode.* Visit Us Today *For a must-own Nissan Sentra come see us at Reed Nissan Clermont, 16005 State Hwy 50, Clermont, FL 34711. Just minutes away!

Contact Reed Nissan Clermont

Call (352) 415-8387

Reed Nissan Clermont
3.4 |
348 Lifetime Reviews

16005 FL-50

Clermont, Florida 34711

(352) 415-8387

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2026 Nissan Sentra car, priced at $25,222
2026 Nissan Sentra
new
Atlantic Gray Metallic exterior
Automatic
Front-wheel Drive
new 2026 Nissan Sentra car, priced at $26,863
2026 Nissan Sentra
new
Atlantic Gray Metallic/Super Black exterior
Automatic
Front-wheel Drive
new 2026 Nissan Sentra car, priced at $24,860
2026 Nissan Sentra
new
Super Black exterior
Automatic
Front-wheel Drive
new 2026 Nissan Sentra car, priced at $26,418
2026 Nissan Sentra
new
Atlantic Gray Metallic exterior
Automatic
Front-wheel Drive
new 2026 Nissan Sentra car, priced at $24,065
2026 Nissan Sentra
new
Scarlet Ember Tintcoat exterior
Automatic
Front-wheel Drive
new 2026 Nissan Sentra car, priced at $25,621
2026 Nissan Sentra
new
Super Black exterior
Automatic
Front-wheel Drive

While we make every effort to ensure the data listed here is correct, there may be instances where some of the pricing, options or vehicle features may be listed incorrectly as we get data from multiple data sources. Please confirm the details of this vehicle with the dealer to ensure its accuracy. Dealer cannot be held liable for data that is listed incorrectly. All prices advertised exclude Tax, Tag, Title, $1,199 pre-delivery service fee, and $159 electronic registration filing fee.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.