Powered by Cars.com

2024 Chevrolet Silverado 1500

$33,117used

Contact Dealership

Basics

Condition

used

Interior Color

jet black

Exterior Color

black

Drivetrain

Four-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv

VIN

3GCNDAEK1RG100689

Stock Number

B0595

Mileage

7,101

Features

Entertainment

Premium Sound System

Exterior

Tow Hitch

Convenience

Keyless Start

Tow Hooks

USB Port

Safety

Automatic Emergency Braking

Backup Camera

Brake Assist

Stability Control

Rear Cross Traffic Alert

Lane Departure Warning

View Full List of Features

Seller's Comments

Get the job done with confidence in this sharp-looking 2024 Chevrolet Silverado 1500 WT, available now at Ryan Chevrolet in Buffalo, MN. Customized with bronze FUEL 20'' rims and a set of meaty BFGoodrich Baja Champion all-terrain tires, this truck is built for durability and capability, delivering dependable performance and modern technology for drivers across Buffalo, St. Cloud, Elk River, and the surrounding area.Powered by a proven engine paired with a smooth-shifting transmission and four-wheel drive, the Silverado WT is engineered to handle tough Minnesota conditions with ease. Standard equipment includes a rugged suspension, a spacious and functional cabin, and Chevrolets advanced infotainment system with wireless Apple CarPlay and Android Auto connectivity, making it easy to stay connected on the go.Inside, this Silverado offers practical comfort with air conditioning, a rear window defroster, and a premium audio system for an enhanced driving experience. Safety is a priority with standard driver assistance features including automatic emergency braking, forward collision alert, lane departure warning with lane keep assist, automatic high beams, pedestrian braking, and a rear vision camera, providing added confidence whether on the highway or job site.This truck is built to perform with an auto-locking rear differential for improved traction and a 6-foot 6-inch cargo bed that offers excellent hauling capability. It is also equipped with LED cargo bed lighting, a trailer brake controller, tow hooks, and a spray-on bedliner, making it ready for work or weekend projects.This Silverado 1500 WT comes with a clean vehicle history and one previous owner. It has been thoroughly reconditioned with a multi-point inspection, fresh oil change, and a complete interior and exterior detail to ensure it is ready for its next owner. For added peace of mind, a free CARFAX Vehicle History Report is available on our website.If you are searching for a reliable and capable truck in Buffalo, MN that is ready to work as hard as you do, this 2024 Chevrolet Silverado 1500 WT is an excellent choice. Contact us for availability and a test drive today. Buy with confidence at Ryan Auto Mall, where trust is earned and results speak for themselves. Backed by more than 23,000 customer reviews and 70 Minnesota DealerRater Dealer of the Year awards, weve built a reputation you can rely on.This pre-owned vehicle includes warranty coverage for added peace of mind, whether its remaining factory warranty or a limited powertrain warranty. Additional vehicle service contracts are also available for extended protection.Pricing includes all dealer fees. Government fees, including state sales tax, title, and licensing, are additional.Visit us at 911 E Hwy 55 in Buffalo or call (612) 326-6209 to schedule your test drive and discover the Ryan difference.

Contact Ryan Auto Mall

Call (763) 682-2424

Ryan Auto Mall
4.9 |
5,966 Lifetime Reviews

PO Box 513

Buffalo, Minnesota 55313

(763) 682-2424

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2026 Chevrolet Silverado 1500 car, priced at $74,935
2026 Chevrolet Silverado 1500
new
Black exterior
Automatic
Four-wheel Drive
new 2026 Chevrolet Silverado 1500 car, priced at $47,955
2026 Chevrolet Silverado 1500
new
Black exterior
Automatic
Four-wheel Drive
new 2026 Chevrolet Silverado 1500 car, priced at $49,925
2026 Chevrolet Silverado 1500
new
Black exterior
Automatic
Four-wheel Drive
used 2023 Chevrolet Silverado 1500 car, priced at $36,327
2023 Chevrolet Silverado 1500
used
Dark Ash Metallic exterior
Automatic
Four-wheel Drive
used 2017 Chevrolet Silverado 1500 car, priced at $22,936
2017 Chevrolet Silverado 1500
used
Iridescent Pearl Tricoat exterior
Automatic
Four-wheel Drive
new 2026 Chevrolet Silverado 1500 car, priced at $52,545
2026 Chevrolet Silverado 1500
new
Summit White exterior
Automatic
Four-wheel Drive
new 2026 Chevrolet Silverado 1500 car, priced at $48,925
2026 Chevrolet Silverado 1500
new
Sterling Gray Metallic exterior
Automatic
Four-wheel Drive

Not all buyers will qualify for the interest rates quoted. The buyer must be approved by an appropriate lending source. At Ryan Auto Mall we try hard to keep the information shown on-line error free. However, occasionally mistakes occur. Ryan Auto Mall is not responsible for any errors, omissions or inaccurate pricing that may be reflected on vehicles listed on this website. For the latest availability of inventory and to confirm pricing and rebate offers please contact us. Thank you for your consideration and we look forward to serving you.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.