Powered by Cars.com

2024 Hyundai IONIQ 5

$20,908used

Contact Dealership

Basics

Condition

used

Interior Color

gray

Exterior Color

lucid blue

Drivetrain

Rear-wheel Drive

Transmission

Automatic

Fuel

Electric

Engine

Electric

VIN

KM8KN4DE0RU293570

Stock Number

23940

Mileage

43,088

Features

Seating

Heated Seats

Exterior

LED Headlights

Alloy Wheels

Safety

Automatic Emergency Braking

Backup Camera

Blind Spot Monitor

Brake Assist

Stability Control

Lane Departure Warning

Rear Cross Traffic Alert

Convenience

Adaptive Cruise Control

Keyless Start

HomeLink

Heated Steering Wheel

Navigation System

Power Liftgate

Remote Start

USB Port

View Full List of Features

Seller's Comments

The 2024 Hyundai IONIQ 5 SEL RWD in Lucid Blue presents a bold and modern appeal, seamlessly blending advanced technology with aesthetic elegance. This striking electric vehicle boasts a sleek silhouette that reflects Hyundai's commitment to innovative design, making it a standout on any road. Its stylish exterior is complemented by the sophisticated Gray interior, providing a serene environment for both the driver and passengers. Equipped with state-of-the-art technology, the IONIQ 5 SEL ensures a safe and enjoyable driving experience. Active cruise control and lane keep assist take the stress out of long drives, while the forward collision warning and blind spot monitor provide enhanced safety. The parking assist and hands-free liftgate offer added convenience, making city driving and errands more manageable. Not to mention, heated seats add a touch of luxury, ensuring comfort in any weather. Featuring practical accessories like carpeted floor mats, mudguards, wheel locks, and a versatile cargo net, the IONIQ 5 is as functional as it is stylish. The thoughtful inclusion of a towing package extends the vehicles utility, perfect for weekend getaways or transporting larger items. A charging port applique and the advanced Bluetooth system further enhance the driving experience with easy connectivity and functionality. Whether navigating city streets or taking a leisurely drive, the 2024 Hyundai IONIQ 5 SEL RWD is a forward-thinking choice for the modern driver.

Contact Westcoast Auto Sales

Call (909) 900-0000

Westcoast Auto Sales
4.3 |
1,975 Lifetime Reviews

5180 Holt Blvd

Montclair, California 91763

(909) 900-0000

Similar Vehicles

used 2024 Hyundai IONIQ 5 car, priced at $21,132
2024 Hyundai IONIQ 5
used
Abyss Black exterior
Automatic
Rear-wheel Drive
used 2024 Hyundai IONIQ 5 car, priced at $22,024
2024 Hyundai IONIQ 5
used
Abyss Black exterior
Automatic
Rear-wheel Drive
used 2024 Hyundai IONIQ 5 car, priced at $22,081
2024 Hyundai IONIQ 5
used
Abyss Black exterior
Automatic
Rear-wheel Drive
used 2023 Hyundai IONIQ 5 car, priced at $20,450
2023 Hyundai IONIQ 5
used
Gravity Gold (Matte Gold) exterior
Automatic
Rear-wheel Drive
used 2024 Hyundai IONIQ 5 car, priced at $22,155
2024 Hyundai IONIQ 5
used
Abyss Black exterior
Automatic
Rear-wheel Drive
used 2023 Hyundai IONIQ 5 car, priced at $23,870
2023 Hyundai IONIQ 5
used
Abyss Black exterior
Automatic
All-wheel Drive

The advertised price reflects the vehicle purchase price only and does not include applicable tax, license, registration, title, government fees. All vehicles are offered on a first come, first served basis and may be subject to prior sale. Vehicle availability is not guaranteed until a completed purchase agreement has been signed and payment arrangements have been finalized. We strive to ensure that all pricing, descriptions, equipment details, and photos are accurate. However, specifications, features, and availability may vary. Buyers are encouraged to verify all vehicle information prior to purchase. In the event of a typographical, pricing, or data error, the dealership reserves the right to correct such information at any time.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.