Powered by Cars.com

2026 BMW X3

$56,890new

MSRP: $56,890

Contact Dealership

Basics

Condition

new

Interior Color

black

Exterior Color

dune grey metallic

Drivetrain

All-wheel Drive

Transmission

Automatic

Fuel

Hybrid

Engine

Intercooled Turbo Gas/Electric I-4 2.0 L/122

VIN

5UX53GP06T9207504

Stock Number

W35278

Mileage

0

Features

Seating

Heated Seats

Memory Seat

Exterior

Alloy Wheels

Sunroof/Moonroof

LED Headlights

Convenience

Keyless Start

Navigation System

Power Liftgate

HomeLink

Safety

Backup Camera

Blind Spot Monitor

Brake Assist

Lane Departure Warning

Stability Control

View Full List of Features

Seller's Comments

This New 2026 Dune Gray Metallic BMW X3 xDrive30 AWD is well equipped and includes these features and benefits:

Premium Package (Distance Control (ACC) w/Steering Assistant, Driving Assistance Plus, Heated Steering Wheel, Interior Camera, Live Cockpit Pro w/Navi, Panorama Moonroof, Parking Assistant Plus, Parking View w/3D View (Surround View), Premium Content 1, Remote Engine Start, and Travel & Comfort System), 8-Speed Automatic, 12 Speakers, 4-Wheel Disc Brakes, ABS brakes, Air Conditioning, Alloy wheels, AM/FM Radio, AM/FM radio: SiriusXM, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front reading lights, Fully automatic headlights, Garage door transmitter, Genuine wood console insert, harman/kardon Surround Sound System, Heated door mirrors, Heated Front Seats, Heated front seats, Hi-Fi Sound System, Illuminated entry, Knee airbag, Low tire pressure warning, Lumbar Support, Memory seat, Navigation, Navigation system: BMW Maps Navigation, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Personal eSIM 5G, Power door mirrors, Power driver seat, Power Front Seats, Power Liftgate, Power moonroof: Panoramic, Power passenger seat, Power steering, Power windows, Radio data system, Rain sensing wipers, Rear anti-roll bar, Rear reading lights, Rear seat center armrest, Rear window defroster, Rear window wiper, Remote keyless entry, Security system, SiriusXM w/360L & 1 Year Trial Subscription, Speed control, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport Seats, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Veganza Perforated & Quilted Upholstery, Wheels: 19" x 8.5" Aero Midnight Grey Bicolor, and Wireless Device Charging. 8-Speed Automatic. 27/33 City/Highway MPG

Contact Union Park Honda BMW Buick GMC Volvo Cars Jaguar

Call (302) 658-7245

Union Park Honda BMW Buick GMC Volvo Cars Jaguar
2.8 |
506 Lifetime Reviews

1704 Pennsylvania Ave

Wilmington, Delaware 19806

(302) 658-7245

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2026 BMW X3 car, priced at $74,340
2026 BMW X3
new
Black Sapphire Metallic exterior
Automatic
All-wheel Drive
used 2024 BMW X3 car, priced at $43,990
2024 BMW X3
used
Mineral White Metallic exterior
Automatic
All-wheel Drive
used 2024 BMW X3 car, priced at $39,990
2024 BMW X3
used
Black Sapphire Metallic exterior
Automatic
All-wheel Drive
used 2019 BMW X3 car, priced at $22,990
2019 BMW X3
used
Dark Graphite Metallic exterior
Automatic
All-wheel Drive
new 2026 BMW X3 car, priced at $74,290
2026 BMW X3
new
Vegas Red Metallic exterior
Automatic
All-wheel Drive
used 2022 BMW X3 car, priced at $33,990
2022 BMW X3
used
Black Sapphire Metallic exterior
Automatic
All-wheel Drive

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.