Powered by Cars.com

2026 Chevrolet Colorado

$41,559new

MSRP: $44,920

Contact Dealership

Basics

Condition

new

Interior Color

jet black

Exterior Color

reef blue metallic

Drivetrain

Four-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

Turbocharged Gas I4 2.7L/

VIN

1GCPTEEK8T1118289

Stock Number

34050

Mileage

0

Features

Exterior

Alloy Wheels

Tow Hitch

Safety

Backup Camera

Blind Spot Monitor

Lane Departure Warning

Stability Control

Convenience

Keyless Start

Navigation System

Remote Start

Heated Steering Wheel

Tow Hooks

View Full List of Features

Seller's Comments

Factory MSRP: $44,920 $3,361 off MSRP! 4WD, 4-Way Manual Passenger Seat Adjuster, 6 Speakers, 6-Speaker Audio System Feature, 6-Way Manual Driver Seat Adjuster, ABS brakes, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM with 360L, Apple CarPlay/Android Auto, Automatic temperature control, Cloth Seat Trim, Compass, Driver door bin, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: OnStar, Following Distance Indicator, Front anti-roll bar, Front dual zone A/C, Front wheel independent suspension, Heated door mirrors, Illuminated entry, IntelliBeam Automatic High Beam On/Off, Lane Keep Assist w/Lane Departure Warning, Low tire pressure warning, Outside temperature display, Power steering, Radio data system, Radio: 11.3" Diagonal Advanced Color LCD Display, Rear step bumper, Rear window defroster, Remote keyless entry, SiriusXM w/360L Trial Subscription, Steering Wheel Mounted Audio Controls, Traction control, Wireless Phone Projection.


Blue Metallic 2026 Chevrolet Colorado Trail Boss 4D Crew Cab 2.7L I4 Turbocharged DOHC 16V LEV3-ULEV50 310hp 8-Speed Automatic 4WD Price includes: $500 - Chevrolet Consumer Cash Program. Exp. 11/03/2025

Contact Karl Chevrolet

Call (515) 299-4300

Karl Chevrolet
0 |
98 Lifetime Reviews

1101 SE Oralabor Rd

Ankeny, Iowa 50021

(515) 299-4300

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2025 Chevrolet Colorado car, priced at $53,927
2025 Chevrolet Colorado
new
Black exterior
Automatic
Four-wheel Drive
new 2025 Chevrolet Colorado car, priced at $53,320
2025 Chevrolet Colorado
new
Sterling Gray Metallic exterior
Automatic
Four-wheel Drive
new 2026 Chevrolet Colorado car, priced at $40,503
2026 Chevrolet Colorado
new
Summit White exterior
Automatic
Four-wheel Drive
2026 Chevrolet Colorado
new
Sterling exterior
Automatic
Four-wheel Drive
used 2024 Chevrolet Colorado car, priced at $39,485
2024 Chevrolet Colorado
used
Radiant Red Tintcoat exterior
Automatic
Four-wheel Drive
used 2024 Chevrolet Colorado car, priced at $39,987
2024 Chevrolet Colorado
used
Radiant Red Tintcoat exterior
Automatic
Four-wheel Drive

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.