Powered by Cars.com

2026 Ford F-350

$52,343new

MSRP: $59,265

Contact Dealership

Basics

Condition

new

Interior Color

medium dark slate

Exterior Color

oxford white

Drivetrain

Four-wheel Drive

Transmission

Automatic

Fuel

Flex

Engine

6.8L V8 16V MPFI SOHC Flexible Fuel

VIN

1FT8X3BA1TEC85515

Stock Number

T04126

Mileage

10

Features

Convenience

USB Port

Exterior

Tow Hitch

Safety

Brake Assist

Stability Control

Backup Camera

View Full List of Features

Seller's Comments

WHY PURCHASE YOUR NEXT VEHICLE FROM BOB RUTH FORD? At Bob Ruth Ford, we provide a better way to buy both new and used vehicles with upfront pricing, transparency, and respect for your time. Every pre-owned vehicle is inspected for condition and performance. Vehicles are competitively priced based on mileage, condition, and current market data. As the home of the VIP Experience, we offer no-haggle pricing, 100% online purchasing, curbside pickup, nationwide delivery, and access to 40+ lenders for competitive financing options. - FX4 OFF-ROAD PACKAGE - PLATFORM RUNNING BOARDS - MEDIUM DARK SLATE, CLOTH 40/20/40 SPLIT BENCH SEAT - POWER-SLIDING REAR-WINDOW W/DEFROST - 5TH WHEEL/GOOSENECK HITCH PREP PACKAGE - UPFITTER SWITCHES (6) - TAILGATE STEP & HANDLE - PRIVACY GLASS - XL CHROME PACKAGE - TIRES: LT245/75RX17E BSW A/T (4) - ELECTRONIC-LOCKING W/3.73 AXLE RATIO - Remote keyless entry - Electronic Stability Control - Traction control - Heated door mirrors - Compass - Illuminated entry This 2026 Ford F-350SD XL delivers exceptional capability and versatility for your towing, hauling, and off-road needs. With its powerful 6.8L V8 engine, 4WD drivetrain, and an array of thoughtful features, this truck is ready to handle any task you throw its way. The FX4 Off-Road Package equips the F-350 with specialized hardware to conquer even the toughest terrain, while the 5th Wheel/Gooseneck Hitch Prep Package ensures seamless integration with your heavy-duty towing setup. Inside, the roomy and comfortable cabin offers ample space for both passengers and cargo, with convenient amenities like a power-sliding rear window and upfitter switches for easy customization. Whether you're tackling a job site, exploring the great outdoors, or just need a reliable daily driver, this F-350SD is ready to put in the hard work. COMPLIMENTARY FIRST SERVICE PROGRAM & FINANCING OPTIONS Every new and used vehicle purchased at Bob Ruth Ford includes our Complimentary First Service Program for added value and peace of mind. Program includes: Engine oil and filter replacement Chassis lubrication Fluid level inspection Tire rotation and pressure adjustment Multi-point inspection (emissions not included) Lifetime PA inspection Our finance team works with national banks, local credit unions, and manufacturer programs to provide competitive loan and lease options for many credit profiles. We can assist with: New and used vehicle financing Lease options on select new models Flexible financing solutions Complete our secure online credit application to get started. Price includes: $500 - Employee Pricing Retail Customer Cash. Exp. 07/06/2026

Contact Bob Ruth Ford

Call (877) 818-1593

Bob Ruth Ford
3.5 |
730 Lifetime Reviews

700 N U.S. Route 15

Dillsburg, Pennsylvania 17019

(877) 818-1593

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2026 Ford F-350 car, priced at $54,370
2026 Ford F-350
new
Oxford White exterior
Automatic
Four-wheel Drive
used 2022 Ford F-350 car, priced at $44,990
2022 Ford F-350
used
Oxford White exterior
Automatic
Four-wheel Drive
2026 Ford F-350
used
Agate Black Metallic exterior
Automatic
Four-wheel Drive
new 2026 Ford F-350 car, priced at $52,049
2026 Ford F-350
new
Oxford White exterior
Automatic
Four-wheel Drive
used 2024 Ford F-350 car, priced at $55,990
2024 Ford F-350
used
Bronze Metallic exterior
Automatic
Four-wheel Drive
used 2023 Ford F-350 car, priced at $47,990
2023 Ford F-350
used
Iconic Silver Metallic exterior
Automatic
Four-wheel Drive

Dealer Disclaimer: Vehicle Monthly Payment is calculated at 10.9% APR, 72 Month Term, 6% sales tax with 20% down on approved credit. The advertised price does not include sales tax, vehicle registration fees, finance charges, documentation charges, and any other fees required by law. We attempt to update this inventory on a regular basis. However, there can be lag time between the sale of a vehicle and the update of the inventory. EPA mileage estimates are for newly manufactured vehicles only. Your actual mileage will vary depending on how you drive and maintain your vehicle. Before purchasing this vehicle, it is your responsibility to address any and all differences between information on this website and the actual vehicle specifications and/or any warranties offered prior to the sale of this vehicle. Vehicle data on this website is compiled from publicly available sources believed by the publisher to be reliable. Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in this data, the compilation of this data and makes no representations, express or implied to any actual or prospective purchaser of the vehicle as to the condition of the vehicle, vehicle specifications, ownership, vehicle history, equipment/accessories, price or warranties. Not responsible for typographical or data entry errors. See dealer for actual price of vehicles displayed. Although every reasonable effort has been made to insure the accuracy of the information contained on this site, absolute accuracy cannot be guaranteed. This site, and all information and materials appearing on it, are presented to the user "As-Is" without warranty of any kind, either express or implied. All vehicles are subject to change without notice or to prior sale. Vehicles 10 years old or 75,000 miles or more are offered "As-Is" with no warranty implied. All vehicle fees do not include an additional documentation fee of $490.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.